Strategies for Managing an In-Service Continuously Reinforced Concrete Pavement in Illinois

Abhik J. Borthakur, Arturo Espinoza-Luque, Kelly L. Smith, Kurt Smith, Michael Short
{"title":"Strategies for Managing an In-Service Continuously Reinforced Concrete Pavement in Illinois","authors":"Abhik J. Borthakur, Arturo Espinoza-Luque, Kelly L. Smith, Kurt Smith, Michael Short","doi":"10.1177/03611981241255370","DOIUrl":null,"url":null,"abstract":"The Illinois Department of Transportation (IDOT) District 3 office sought a comprehensive, long-term plan for fiscally managing a 36-mi portion of I-39 in LaSalle County, Illinois. To accomplish this, IDOT initiated a study to evaluate the historical and current conditions of the continuously reinforced concrete pavement constituting I-39, determine the pavement needs, and develop cost-effective, long-term strategy recommendations for keeping the facility at an acceptable serviceability level over an extended period of time. The project consisted of three phases: (1) review and analysis of construction, maintenance and repair, and time-series pavement condition data; (2) supplemental field data collection and analysis; and (3) pavement strategy development and cost analyses. Using the historical records and performance data, the project was subdivided into segments based on unique pavement conditions and needs. An optimal pavement strategy was developed for each road segment, reflecting the best theoretical solution, based on performance data and pavement management guidance. Two suboptimal strategies were then developed, one reflecting a preventive treatment approach and the other an aggressive treatment approach. Each strategy was defined by a series of treatments at different times, covering a 50-year analysis period. The strategy cost analyses included the computation of life-cycle costs and benefit–cost ratios for each strategy alternative, and a risk assessment of the suboptimal strategies. The cost analysis results provided IDOT District 3 with critical information for selecting the most economical set of long-term strategies for keeping the I-39 pavement segments serviceable for the traveling public over the 50-year planning period.","PeriodicalId":309251,"journal":{"name":"Transportation Research Record: Journal of the Transportation Research Board","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Research Record: Journal of the Transportation Research Board","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/03611981241255370","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Illinois Department of Transportation (IDOT) District 3 office sought a comprehensive, long-term plan for fiscally managing a 36-mi portion of I-39 in LaSalle County, Illinois. To accomplish this, IDOT initiated a study to evaluate the historical and current conditions of the continuously reinforced concrete pavement constituting I-39, determine the pavement needs, and develop cost-effective, long-term strategy recommendations for keeping the facility at an acceptable serviceability level over an extended period of time. The project consisted of three phases: (1) review and analysis of construction, maintenance and repair, and time-series pavement condition data; (2) supplemental field data collection and analysis; and (3) pavement strategy development and cost analyses. Using the historical records and performance data, the project was subdivided into segments based on unique pavement conditions and needs. An optimal pavement strategy was developed for each road segment, reflecting the best theoretical solution, based on performance data and pavement management guidance. Two suboptimal strategies were then developed, one reflecting a preventive treatment approach and the other an aggressive treatment approach. Each strategy was defined by a series of treatments at different times, covering a 50-year analysis period. The strategy cost analyses included the computation of life-cycle costs and benefit–cost ratios for each strategy alternative, and a risk assessment of the suboptimal strategies. The cost analysis results provided IDOT District 3 with critical information for selecting the most economical set of long-term strategies for keeping the I-39 pavement segments serviceable for the traveling public over the 50-year planning period.
伊利诺伊州在役连续加固混凝土路面管理策略
伊利诺伊州交通部 (IDOT) 第 3 区办事处寻求一项全面、长期的计划,对伊利诺伊州拉萨尔县 36 英里长的 I-39 州际公路进行财务管理。为此,IDOT 启动了一项研究,以评估构成 I-39 号公路的连续钢筋混凝土路面的历史和现状,确定路面需求,并制定具有成本效益的长期战略建议,使该设施在较长时间内保持在可接受的适用性水平。该项目包括三个阶段:(1) 审查和分析施工、维护和修理以及路面状况的时间序列数据;(2) 补充实地数据收集和分析;(3) 路面战略制定和成本分析。利用历史记录和性能数据,根据独特的路面状况和需求,将项目细分为若干段。根据性能数据和路面管理指南,为每个路段制定了最佳路面策略,以反映最佳理论解决方案。然后制定了两个次优策略,一个反映了预防性处理方法,另一个反映了积极的处理方法。每种策略都由不同时间的一系列处理方法确定,涵盖 50 年的分析期。战略成本分析包括计算每个备选战略的生命周期成本和效益成本比,以及次优战略的风险评估。成本分析结果为 IDOT 第 3 区提供了重要信息,以便选择一套最经济的长期策略,使 I-39 路面路段在 50 年规划期内为公众出行提供服务。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信