The Influence of Contractors’ Selection Attributes. A Study of Public Construction Projects Performance in Kenya

Harrison Wachira Kiiru, G. Wanyona, S. Diang’a, John Kihoro
{"title":"The Influence of Contractors’ Selection Attributes. A Study of Public Construction Projects Performance in Kenya","authors":"Harrison Wachira Kiiru, G. Wanyona, S. Diang’a, John Kihoro","doi":"10.37284/eajbe.7.1.2017","DOIUrl":null,"url":null,"abstract":"This paper evaluated the influence of contractors’ selection attributes on public construction project performance in Kenya. This research contends that an investigation into contractors’ selection attributes at the tender evaluation stage is important to enhance the likelihood of public construction project success performance. The study used a survey method and administered questionnaires to 263 respondents selected through stratified sampling. One hundred and eighty-nine (189) practitioners and professionals in state agencies returned filed questionnaires representing a 71.86% return rate. The literature review and interview reveal thirteen contractor selection variables and six project performance criteria. SPSS was used to analyse the data set obtained for reliability, normality, correlation, and logit regression test. Logit regression analysis reveals the omnibus test of model coefficients converged (Chi-square=26.116, df=13, p=0.016). The model summary reveals Nagelkerke R^2 of 0.246 indicating a relationship of 24.6% between the thirteen predictor variables and project performance indicators. It was found that contractors quoted tender price (Exp (B) = 1.866), innovation (Exp (B) = 2.808), and occupation health and safety (Exp (B) = 0.358) significantly influence the performance of public construction projects when all other contractor's selection variables are controlled. This indicates that the contractor’s quoted tender price, innovation, and occupation health and safety explain well the success of the public construction project from thea six (performance by budget, time, procuring entity satisfaction, environmental sustainability, quality specifications, and fulfilling public need) project performance indicators","PeriodicalId":474170,"journal":{"name":"East African journal of business and economics","volume":"68 s275","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"East African journal of business and economics","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.37284/eajbe.7.1.2017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper evaluated the influence of contractors’ selection attributes on public construction project performance in Kenya. This research contends that an investigation into contractors’ selection attributes at the tender evaluation stage is important to enhance the likelihood of public construction project success performance. The study used a survey method and administered questionnaires to 263 respondents selected through stratified sampling. One hundred and eighty-nine (189) practitioners and professionals in state agencies returned filed questionnaires representing a 71.86% return rate. The literature review and interview reveal thirteen contractor selection variables and six project performance criteria. SPSS was used to analyse the data set obtained for reliability, normality, correlation, and logit regression test. Logit regression analysis reveals the omnibus test of model coefficients converged (Chi-square=26.116, df=13, p=0.016). The model summary reveals Nagelkerke R^2 of 0.246 indicating a relationship of 24.6% between the thirteen predictor variables and project performance indicators. It was found that contractors quoted tender price (Exp (B) = 1.866), innovation (Exp (B) = 2.808), and occupation health and safety (Exp (B) = 0.358) significantly influence the performance of public construction projects when all other contractor's selection variables are controlled. This indicates that the contractor’s quoted tender price, innovation, and occupation health and safety explain well the success of the public construction project from thea six (performance by budget, time, procuring entity satisfaction, environmental sustainability, quality specifications, and fulfilling public need) project performance indicators
承包商选择属性的影响。肯尼亚公共建筑项目绩效研究
本文评估了承包商的选择属性对肯尼亚公共建筑项目绩效的影响。本研究认为,在投标评估阶段对承包商的选择属性进行调查,对于提高公共建设项目成功绩效的可能性非常重要。本研究采用调查法,对通过分层抽样选出的 263 名受访者进行了问卷调查。国家机构的 189 名从业人员和专业人员交回了提交的问卷,回收率为 71.86%。文献综述和访谈揭示了 13 个承包商选择变量和 6 个项目绩效标准。研究人员使用 SPSS 对所获得的数据集进行了可靠性、正态性、相关性和 Logit 回归检验分析。对数回归分析表明,模型系数的总括检验趋于一致(Chi-square=26.116,df=13,p=0.016)。模型总结显示,Nagelkerke R^2 为 0.246,表明 13 个预测变量与项目绩效指标之间的关系为 24.6%。研究发现,在控制了所有其他承包商选择变量的情况下,承包商的投标报价(Exp (B) = 1.866)、创新(Exp (B) = 2.808)和职业健康与安全(Exp (B) = 0.358)对公共建设项目的绩效有显著影响。这表明,从六个项目绩效指标(预算绩效、时间绩效、采购实体满意度、环境可持续性、质量规格和满足公众需求)来看,承包商的投标报价、创新和职业健康与安全能很好地解释公共建设项目的成功与否。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信