Design of electrical primary section of 220kV substation in Tiexi District, Haicheng City

Shuping Li
{"title":"Design of electrical primary section of 220kV substation in Tiexi District, Haicheng City","authors":"Shuping Li","doi":"10.1117/12.3030603","DOIUrl":null,"url":null,"abstract":"The main functions of the 220kV substation in Tiexi District, Haicheng City are to receive, distribute, and transfer electrical energy in the power system. As an basic but significant part of the construction of substations, the design scheme of the electrical main wiring not only directly affects the stability and flexibility of operation, but also directly determines the selection of electrical equipment and the configuration of various protections. It is a crucial factor for reasonable investment in the electrical equipment of substations. The paper conducts an overall analysis and research on the substation through raw data, determining the design direction, design ideas, and planning of the substation; Using known existing conditions, complete the total load calculation, reactive power compensation calculation, and determine the selection of the main transformer for verification. The selection of the main wiring scheme that best fits the current situation of Tiexi District in Haicheng City has achieved a complete electrical primary design of the substation.","PeriodicalId":198425,"journal":{"name":"Other Conferences","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Other Conferences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.3030603","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The main functions of the 220kV substation in Tiexi District, Haicheng City are to receive, distribute, and transfer electrical energy in the power system. As an basic but significant part of the construction of substations, the design scheme of the electrical main wiring not only directly affects the stability and flexibility of operation, but also directly determines the selection of electrical equipment and the configuration of various protections. It is a crucial factor for reasonable investment in the electrical equipment of substations. The paper conducts an overall analysis and research on the substation through raw data, determining the design direction, design ideas, and planning of the substation; Using known existing conditions, complete the total load calculation, reactive power compensation calculation, and determine the selection of the main transformer for verification. The selection of the main wiring scheme that best fits the current situation of Tiexi District in Haicheng City has achieved a complete electrical primary design of the substation.
海城市铁西区 220kV 变电站电气一次段设计
海城市铁西区 220kV 变电站的主要功能是在电力系统中接收、分配和传输电能。电气主接线的设计方案作为变电站建设中基础而又重要的一环,不仅直接影响着变电站运行的稳定性和灵活性,而且直接决定着电气设备的选型和各种保护的配置。它是变电站电气设备合理投资的关键因素。本文通过原始数据对变电站进行整体分析研究,确定变电站的设计方向、设计思路、规划方案;利用已知现有条件,完成总负荷计算、无功补偿计算,确定主变压器的选型进行校核。选择最符合海城市铁西区现状的主接线方案,实现了变电站电气一次设计的完整。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信