{"title":"Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa","authors":"Christopher Amoah","doi":"10.1108/jopp-05-2023-0032","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>The South African Government announced the black economic empowerment (BEE) legislation in 2003 in the public procurement systems. The legislation was deemed a catalyst for the emancipation of the previously disadvantaged citizens due to the apartheid government policies that secluded them from economic activities. This study aims to explore the challenges of black construction professionals with the BEE as a procurement policy.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>This study adopted a qualitative research approach. Thirty-five black construction professionals were contacted for interviews, of which 21 responded. Due to the COVID-19 restriction, participants were interviewed using telephone interview techniques. The information received was analysed using the thematic contents analysis method.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>The findings revealed the challenges confronting black construction professionals regarding the BEE policy as corrupt practices (leading to the award of contracts to unqualified people), fronting of contractors and individuals for unqualified firms, preventing the participation of experienced and foreign firms, poor policy implementation with no monitoring mechanism and loss of tender due to strict requirements.</p><!--/ Abstract__block -->\n<h3>Social implications</h3>\n<p>Urgent attention is needed to review the BEE policy implementation process by the South African government to address the challenges enumerated by the policy beneficiaries to ensure the achievement of the policy objectives.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>This study has identified the challenges of the BEE policy; thus, the government can institute measures to address the hindrances thwarting the beneficiaries from realising the policy objectives.</p><!--/ Abstract__block -->","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"8 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2024-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Procurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jopp-05-2023-0032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose
The South African Government announced the black economic empowerment (BEE) legislation in 2003 in the public procurement systems. The legislation was deemed a catalyst for the emancipation of the previously disadvantaged citizens due to the apartheid government policies that secluded them from economic activities. This study aims to explore the challenges of black construction professionals with the BEE as a procurement policy.
Design/methodology/approach
This study adopted a qualitative research approach. Thirty-five black construction professionals were contacted for interviews, of which 21 responded. Due to the COVID-19 restriction, participants were interviewed using telephone interview techniques. The information received was analysed using the thematic contents analysis method.
Findings
The findings revealed the challenges confronting black construction professionals regarding the BEE policy as corrupt practices (leading to the award of contracts to unqualified people), fronting of contractors and individuals for unqualified firms, preventing the participation of experienced and foreign firms, poor policy implementation with no monitoring mechanism and loss of tender due to strict requirements.
Social implications
Urgent attention is needed to review the BEE policy implementation process by the South African government to address the challenges enumerated by the policy beneficiaries to ensure the achievement of the policy objectives.
Originality/value
This study has identified the challenges of the BEE policy; thus, the government can institute measures to address the hindrances thwarting the beneficiaries from realising the policy objectives.
期刊介绍:
The Journal of Public Procurement (JOPP) seeks to further the understanding of public procurement. JOPP publishes original, high-quality research that explores the theories and practices of public procurement. The journal ensures that high-quality research is collected and disseminated widely to both academics and practitioners, and provides a forum for debate. It covers all subjects relating to the purchase of goods, services and works by public organizations at a local, regional, national and international level. JOPP is multi-disciplinary, with a broad approach towards methods and styles of research as well as the level of issues addressed. The Journal welcomes the submission of papers from researchers internationally. The journal welcomes research papers, narrative essays, exemplar cases, forums, and book reviews.