Simulating a reservoir on-site flood plan test: Operation Redbrook

Q4 Earth and Planetary Sciences
Merlin Davis
{"title":"Simulating a reservoir on-site flood plan test: Operation Redbrook","authors":"Merlin Davis","doi":"10.1680/jdare.2024.4","DOIUrl":null,"url":null,"abstract":"The Canal and River Trust, undertaker for 71 high-risk reservoirs, has developed a schedule to conduct a desktop test annually and a full incident simulation exercise every five years. The paper covers the methodology for developing the desktop test, integrating international best practices and strategies from other industries. Practical insights for effectively conducting a desktop exercise, ranging from the selection of failure mode scenarios to debriefings, are provided. The importance of a full simulation was highlighted following the Toddbrook incident. The paper describes how to organise a simulation exercise and the considerations for selecting a suitable reservoir, based on access, location, stakeholders, failure mode and risk assessments on the backdrop of ‘Operation Redbrook’ conducted in June 2023. Pre-exercise arrangements include failure mode simulation, welfare, weather warnings, media responses and traffic management. The Trust also engaged the Local Resilience Forum, BT Emergency services and the contractor's supply chain. The challenges faced by contractors in deploying emergency pumps raises questions on proportionality of expenditure for crane pads, assessments for utilities, environmental impacts and traffic management. Strategies to disseminate lessons learnt and continuous improvement of the emergency response system within the Trust are covered.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":"335 2‐3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.2024.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

The Canal and River Trust, undertaker for 71 high-risk reservoirs, has developed a schedule to conduct a desktop test annually and a full incident simulation exercise every five years. The paper covers the methodology for developing the desktop test, integrating international best practices and strategies from other industries. Practical insights for effectively conducting a desktop exercise, ranging from the selection of failure mode scenarios to debriefings, are provided. The importance of a full simulation was highlighted following the Toddbrook incident. The paper describes how to organise a simulation exercise and the considerations for selecting a suitable reservoir, based on access, location, stakeholders, failure mode and risk assessments on the backdrop of ‘Operation Redbrook’ conducted in June 2023. Pre-exercise arrangements include failure mode simulation, welfare, weather warnings, media responses and traffic management. The Trust also engaged the Local Resilience Forum, BT Emergency services and the contractor's supply chain. The challenges faced by contractors in deploying emergency pumps raises questions on proportionality of expenditure for crane pads, assessments for utilities, environmental impacts and traffic management. Strategies to disseminate lessons learnt and continuous improvement of the emergency response system within the Trust are covered.
模拟水库现场洪水计划测试:红溪行动
运河与河流信托基金是 71 个高风险水库的管理者,它制定了一个时间表,每年进行一次桌面测试,每五年进行一次全面的事故模拟演习。本文介绍了开发桌面测试的方法,并整合了国际最佳实践和其他行业的策略。从故障模式情景的选择到情况汇报,提供了有效开展桌面演练的实用见解。Toddbrook 事件发生后,全面模拟的重要性凸显出来。本文以 2023 年 6 月开展的 "红溪行动 "为背景,介绍了如何组织模拟演习以及选择合适水库的注意事项,包括交通、位置、利益相关者、故障模式和风险评估。演习前的安排包括故障模式模拟、福利、天气预警、媒体响应和交通管理。信托基金还与地方复原力论坛、英国电信紧急服务部门和承包商的供应链进行了接触。承包商在部署应急泵时所面临的挑战提出了起重机垫的支出比例、公用事业评估、环境影响和交通管理等问题。此外,还介绍了在信托基金内部传播经验教训和持续改进应急响应系统的策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信