Project Management Practices and Implementation of Somali Humanitarian Fund Projects by Local Non-Governmental Organizations in Mogadishu, Somalia

Abdihakim Gureh, Alfayos Ondara
{"title":"Project Management Practices and Implementation of Somali Humanitarian Fund Projects by Local Non-Governmental Organizations in Mogadishu, Somalia","authors":"Abdihakim Gureh, Alfayos Ondara","doi":"10.35942/xkzpfp26","DOIUrl":null,"url":null,"abstract":"The effective management and control of a project are fundamental to its success. In the context of intricate projects, such as those associated with the Somali Humanitarian Fund (SHF), strict adherence to a defined scope, schedule, and budget is crucial to attaining the desired outcomes. Humanitarian and Development (SHF) projects carried out by local NGOs in Mogadishu, Somalia. The specific goals of the study included scrutinizing the role of communication in SHF project performance, evaluating the impact of planning on project success, assessing the effects of financing on project performance, and determining the importance of monitoring and evaluation in the implementation of SHF projects. The study was grounded in the Theory of Change, Management by Objective Theory, Adaptive Structuration Theory, and the Theory of Constraints. Employing a descriptive survey design, the research involved a population of 50 SHF projects. Data collection utilized a semi-structured questionnaire, and the analysis was conducted using SPSS, with findings presented through mean scores, standard deviation, and percentages. The findings highlight the critical role of effective communication, comprehensive planning, adequate financing, and robust monitoring and evaluation (M&E) mechanisms in project success. Communication challenges were identified as hindrances to timely project completion, emphasizing the need for improved communication channels and strategies. Planning was deemed essential, but the recognition of inadequate planning as a challenge suggests a need for capacity building and best practice adoption. Financial support was seen as crucial, but there's room for improved assessment by financiers to ensure transparency. M&E processes were acknowledged as integral, yet areas like demonstrating corrective actions and aligning deliverables with objectives need attention for enhanced effectiveness and accountability. Recommendations include enhancing communication channels, bolstering planning capacities, improving financial management practices, and institutionalizing M&E processes. These steps aim to mitigate challenges, optimize resource utilization, and maximize the impact of SHF projects on vulnerable populations in Mogadishu.","PeriodicalId":119984,"journal":{"name":"International Journal of Current Aspects","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Current Aspects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35942/xkzpfp26","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The effective management and control of a project are fundamental to its success. In the context of intricate projects, such as those associated with the Somali Humanitarian Fund (SHF), strict adherence to a defined scope, schedule, and budget is crucial to attaining the desired outcomes. Humanitarian and Development (SHF) projects carried out by local NGOs in Mogadishu, Somalia. The specific goals of the study included scrutinizing the role of communication in SHF project performance, evaluating the impact of planning on project success, assessing the effects of financing on project performance, and determining the importance of monitoring and evaluation in the implementation of SHF projects. The study was grounded in the Theory of Change, Management by Objective Theory, Adaptive Structuration Theory, and the Theory of Constraints. Employing a descriptive survey design, the research involved a population of 50 SHF projects. Data collection utilized a semi-structured questionnaire, and the analysis was conducted using SPSS, with findings presented through mean scores, standard deviation, and percentages. The findings highlight the critical role of effective communication, comprehensive planning, adequate financing, and robust monitoring and evaluation (M&E) mechanisms in project success. Communication challenges were identified as hindrances to timely project completion, emphasizing the need for improved communication channels and strategies. Planning was deemed essential, but the recognition of inadequate planning as a challenge suggests a need for capacity building and best practice adoption. Financial support was seen as crucial, but there's room for improved assessment by financiers to ensure transparency. M&E processes were acknowledged as integral, yet areas like demonstrating corrective actions and aligning deliverables with objectives need attention for enhanced effectiveness and accountability. Recommendations include enhancing communication channels, bolstering planning capacities, improving financial management practices, and institutionalizing M&E processes. These steps aim to mitigate challenges, optimize resource utilization, and maximize the impact of SHF projects on vulnerable populations in Mogadishu.
索马里摩加迪沙当地非政府组织的项目管理做法和索马里人道主义基金项目的实施情况
项目的有效管理和控制是项目成功的基础。在错综复杂的项目中,例如与索马里人道主义基金(SHF)相关的项目,严格遵守规定的范围、时间表和预算对于取得预期成果至关重要。索马里摩加迪沙当地非政府组织开展的人道主义和发展(SHF)项目。本研究的具体目标包括仔细研究沟通在 SHF 项目绩效中的作用,评估规划对项目成功的影响,评估融资对项目绩效的影响,以及确定监测和评估在 SHF 项目实施中的重要性。本研究以 "变革理论"、"目标管理理论"、"适应性结构理论 "和 "制约理论 "为基础。研究采用描述性调查设计,涉及 50 个自助基金项目。数据收集采用半结构式问卷,分析采用 SPSS,研究结果通过平均分、标准差和百分比呈现。研究结果表明,有效的沟通、全面的规划、充足的资金以及健全的监测和评估(M&E)机制对项目的成功起着至关重要的作用。沟通方面的挑战被认为是及时完成项目的障碍,强调需要改进沟通渠道和战略。规划被认为是必不可少的,但认识到规划不足是一项挑战,这表明需要进行能力建设和采用最佳做法。资金支持被视为至关重要,但资金提供者仍有改进评估以确保透明度的余地。监测和评价程序被认为是不可或缺的,但需要关注展示纠正行动和使交付成果与目标相一致等领域,以提高成效和加强问责制。提出的建议包括加强沟通渠道、提高规划能力、改进财务管理做法以及将监测和评价工作制度化。这些步骤旨在减少挑战,优化资源利用,最大限度地发挥社会科学及人文科学基金项目对摩加迪沙弱势群体的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信