SOFTWARE OPTIMIZATION OF RESOURCE ALLOCATION PROCESS IN METRO CONSTRUCTION ORGANIZATIONS: ANALYSIS OF EFFICIENCY OF EXISTING METHODS

{"title":"SOFTWARE OPTIMIZATION OF RESOURCE ALLOCATION PROCESS IN METRO CONSTRUCTION ORGANIZATIONS: ANALYSIS OF EFFICIENCY OF EXISTING METHODS","authors":"","doi":"10.18469/ikt.2023.21.3.09","DOIUrl":null,"url":null,"abstract":"This article explores the objectives of optimal resource allocation in metro construction organizations, including improving work efficiency, reducing project duration, and minimizing costs. The primary optimization methods, such as mathematical modeling, critical path analysis, and the use of network graphs, are discussed in the context of achieving these goals. The role of project management software in providing comprehensive control over planning, resources, and execution is emphasized. Additionally, the article underscores the significance of utilizing the Python programming language and its libraries, such as Pandas, Scikit-learn, and Matplotlib, in analyzing and optimizing resource allocation in metro construction. The paper contains a case study of a software implementation of risk analysis of delivery delays in metro construction using the Python programming language and its key libraries. Pandas for data processing and analysis, NumPy for performing complex mathematical calculations, and Matplotlib for visualizing the results were used.","PeriodicalId":508406,"journal":{"name":"Infokommunikacionnye tehnologii","volume":"8 19","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infokommunikacionnye tehnologii","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18469/ikt.2023.21.3.09","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article explores the objectives of optimal resource allocation in metro construction organizations, including improving work efficiency, reducing project duration, and minimizing costs. The primary optimization methods, such as mathematical modeling, critical path analysis, and the use of network graphs, are discussed in the context of achieving these goals. The role of project management software in providing comprehensive control over planning, resources, and execution is emphasized. Additionally, the article underscores the significance of utilizing the Python programming language and its libraries, such as Pandas, Scikit-learn, and Matplotlib, in analyzing and optimizing resource allocation in metro construction. The paper contains a case study of a software implementation of risk analysis of delivery delays in metro construction using the Python programming language and its key libraries. Pandas for data processing and analysis, NumPy for performing complex mathematical calculations, and Matplotlib for visualizing the results were used.
地铁施工组织资源分配过程的软件优化:现有方法的效率分析
本文探讨了地铁施工组织中优化资源配置的目标,包括提高工作效率、缩短项目工期和降低成本。文章讨论了实现这些目标的主要优化方法,如数学建模、关键路径分析和网络图的使用。文章强调了项目管理软件在全面控制规划、资源和执行方面的作用。此外,文章还强调了利用 Python 编程语言及其库(如 Pandas、Scikit-learn 和 Matplotlib)分析和优化地铁建设资源配置的重要性。本文包含一个案例研究,介绍了使用 Python 编程语言及其关键库对地铁建设中的交付延迟进行风险分析的软件实现。Pandas 用于数据处理和分析,NumPy 用于执行复杂的数学计算,Matplotlib 用于可视化结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信