Hypothesis about the absolute value of subsoil resources

S.N. Rakhmatov, N. Korobovsky, T.Sh. Pazylov, K. Kurmanaliev
{"title":"Hypothesis about the absolute value of subsoil resources","authors":"S.N. Rakhmatov, N. Korobovsky, T.Sh. Pazylov, K. Kurmanaliev","doi":"10.30686/1609-9192-2024-2-151-159","DOIUrl":null,"url":null,"abstract":"Practical assessment of deposits and resources in the Kyrgyz Republic is based on the cost estimation, income and/ or cost methods. The aggregated economic indicators of reduced net cash flows and the internal rate of return, in the dominant sense, reflect the work of capital and premium on capital without legal and economic categories of the mining rent by types of payment for ownership of resources. Currently, the cost of a mining project is defined by the norms of imposed taxes and payments, and, to a large extent, by experimental innovations in the form of a share in the distribution of the net cash flows, bidding and auction payments. Based on the study of the Kumtor mining project for the period of 1996–2020, limits of the mining rent are defined by type, the influence of secondary factors of the economic return from mining and the factor of the project's influence on the macroeconomic indicators of the country. The integrated indicators of the three factors are combined into the category of resource value with the boundaries of revenue sharing for the subsoil owner and the investment capital.","PeriodicalId":506182,"journal":{"name":"Mining Industry Journal (Gornay Promishlennost)","volume":"14 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Industry Journal (Gornay Promishlennost)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2024-2-151-159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Practical assessment of deposits and resources in the Kyrgyz Republic is based on the cost estimation, income and/ or cost methods. The aggregated economic indicators of reduced net cash flows and the internal rate of return, in the dominant sense, reflect the work of capital and premium on capital without legal and economic categories of the mining rent by types of payment for ownership of resources. Currently, the cost of a mining project is defined by the norms of imposed taxes and payments, and, to a large extent, by experimental innovations in the form of a share in the distribution of the net cash flows, bidding and auction payments. Based on the study of the Kumtor mining project for the period of 1996–2020, limits of the mining rent are defined by type, the influence of secondary factors of the economic return from mining and the factor of the project's influence on the macroeconomic indicators of the country. The integrated indicators of the three factors are combined into the category of resource value with the boundaries of revenue sharing for the subsoil owner and the investment capital.
关于底土资源绝对价值的假设
吉尔吉斯共和国矿藏和资源的实际评估以成本估算、收入和/或成本法为基础。减少的净现金流量和内部收益率的综合经济指标,从主要意义上讲,反映了资本的运作和资本溢价,而没有按资源所有权付款类型对采矿租金进行法律和经济分类。目前,采矿项目的成本是由征收的税费和支付的标准来确定的,在很大程度上是由净现金流分配份额、招标和拍卖支付等形式的试验性创新来确定的。根据对 1996-2020 年期间库姆托尔采矿项目的研究,按类型、采矿经济收益次要因素的影响和项目对国家宏观经济指标的影响因素确定了采矿租金的限额。这三个因素的综合指标与底土所有者和投资资本的收益分配界限合并为资源价值类别。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信