Hybrid designs and kick-off batch production experience for the CMS Phase-2 Upgrade

M. Kovacs, M. Abbas, I. Ahmed, G. Blanchot, A. Honma, A. La Rosa, I. Mateos Domínguez, K. Klein, M. Mohammadi Najafabadi, K. Schleidweiler, P. Szydlik, A. Zografos
{"title":"Hybrid designs and kick-off batch production experience for the CMS Phase-2 Upgrade","authors":"M. Kovacs, M. Abbas, I. Ahmed, G. Blanchot, A. Honma, A. La Rosa, I. Mateos Domínguez, K. Klein, M. Mohammadi Najafabadi, K. Schleidweiler, P. Szydlik, A. Zografos","doi":"10.1088/1748-0221/19/04/c04052","DOIUrl":null,"url":null,"abstract":"\n The CMS Tracker Phase-2 Upgrade requires the production of new sensor modules to cope with the requirements of the HL-LHC. The two main building blocks of the Outer Tracker are the Strip-Strip and Pixel-Strip modules. All-together 47'520 hybrid circuits will be produced to construct 8'000 Strip-Strip and 5'880 Pixel-Strip modules. The circuit designs for the mass production were fine-tuned and kick-off batches were manufactured to verify the latest changes in the designs before the series production. This contribution focuses on lessons learned from the prototyping stage, design optimization details for the mass production as well as test results and production yield from the kick-off batches.","PeriodicalId":507814,"journal":{"name":"Journal of Instrumentation","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Instrumentation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1748-0221/19/04/c04052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The CMS Tracker Phase-2 Upgrade requires the production of new sensor modules to cope with the requirements of the HL-LHC. The two main building blocks of the Outer Tracker are the Strip-Strip and Pixel-Strip modules. All-together 47'520 hybrid circuits will be produced to construct 8'000 Strip-Strip and 5'880 Pixel-Strip modules. The circuit designs for the mass production were fine-tuned and kick-off batches were manufactured to verify the latest changes in the designs before the series production. This contribution focuses on lessons learned from the prototyping stage, design optimization details for the mass production as well as test results and production yield from the kick-off batches.
CMS 第二阶段升级的混合设计和启动批量生产经验
CMS 追踪器第二阶段升级需要生产新的传感器模块,以满足 HL-LHC 的要求。外部跟踪器的两个主要构件是条带模块和像素条带模块。总共将生产 47520 个混合电路,以构建 8000 个 Strip-Strip 模块和 5880 个 Pixel-Strip 模块。在批量生产之前,对用于批量生产的电路设计进行了微调,并生产了启动批次,以验证设计中的最新变化。本文重点介绍原型阶段的经验教训、量产的设计优化细节以及启动批次的测试结果和产量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信