Investigating the Influence of Project Initiation Management on Performance of Mega-dam Projects: Empirical Evidence from Kenya

Michael Bongei, Paul Sang, M. Mutuku
{"title":"Investigating the Influence of Project Initiation Management on Performance of Mega-dam Projects: Empirical Evidence from Kenya","authors":"Michael Bongei, Paul Sang, M. Mutuku","doi":"10.37284/eajbe.7.1.1883","DOIUrl":null,"url":null,"abstract":"Performance of large projects including mega-dams could be associated with strict adherence to project life cycle (PLC) phases while considering the risks such as displacement of people and natural ecosystem disturbance. Understanding these risks helps project managers and stakeholders make informed decisions thus creating a positive legacy for the project in the long run. The main objective of the research was to determine how project initiation management influences the performance of mega-dam projects in Kenya. This study was guided by positivist research philosophy. A descriptive cross-sectional survey research design was adopted. In this study, the unit of analysis was 18 mega-dam projects launched and completed across Kenya as listed under the Ministry of Water, Sanitation, and Irrigation (MoWSI) while the unit of observation was the respective three officials (project manager, project engineer, geospatial engineer) in the MoWSI. A Census of all mega-dams completed in Kenya was conducted. In addition, the study purposively interviewed 5 key stakeholders including the cabinet secretary, permanent secretary from the MWSI, donor, contractor, and one randomly selected beneficiary from the community with the target mega-dam. This formed a total sample size of 180 respondents. Primary data was collected using the semi-structured questionnaires as well as the Key Informant Interview (KII) guide. Quantitative and qualitative data from multiple sources and perspectives provided a more comprehensive and robust understanding. Pretesting was done by way of pilot testing to ascertain the validity and reliability of the tools. Descriptive and inferential statistics were used to summarize and describe the key characteristics of the data, as well as draw conclusions and make inferences. Correlation findings showed that project initiation management and performance of selected mega-dam projects in Kenya have a strong positive and significant relationship (r= 0.874, p<0.05). In addition, regression findings showed that one-unit rise in project initiation management corresponds to a 0.433 improvement in the performance of these mega-dam projects. Based on the findings, the study concluded that project initiation management positively and significantly influences the performance of selected mega-dam projects in Kenya. This study therefore recommends that project managers should give priority to project initiation management","PeriodicalId":474170,"journal":{"name":"East African journal of business and economics","volume":"6 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"East African journal of business and economics","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.37284/eajbe.7.1.1883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Performance of large projects including mega-dams could be associated with strict adherence to project life cycle (PLC) phases while considering the risks such as displacement of people and natural ecosystem disturbance. Understanding these risks helps project managers and stakeholders make informed decisions thus creating a positive legacy for the project in the long run. The main objective of the research was to determine how project initiation management influences the performance of mega-dam projects in Kenya. This study was guided by positivist research philosophy. A descriptive cross-sectional survey research design was adopted. In this study, the unit of analysis was 18 mega-dam projects launched and completed across Kenya as listed under the Ministry of Water, Sanitation, and Irrigation (MoWSI) while the unit of observation was the respective three officials (project manager, project engineer, geospatial engineer) in the MoWSI. A Census of all mega-dams completed in Kenya was conducted. In addition, the study purposively interviewed 5 key stakeholders including the cabinet secretary, permanent secretary from the MWSI, donor, contractor, and one randomly selected beneficiary from the community with the target mega-dam. This formed a total sample size of 180 respondents. Primary data was collected using the semi-structured questionnaires as well as the Key Informant Interview (KII) guide. Quantitative and qualitative data from multiple sources and perspectives provided a more comprehensive and robust understanding. Pretesting was done by way of pilot testing to ascertain the validity and reliability of the tools. Descriptive and inferential statistics were used to summarize and describe the key characteristics of the data, as well as draw conclusions and make inferences. Correlation findings showed that project initiation management and performance of selected mega-dam projects in Kenya have a strong positive and significant relationship (r= 0.874, p<0.05). In addition, regression findings showed that one-unit rise in project initiation management corresponds to a 0.433 improvement in the performance of these mega-dam projects. Based on the findings, the study concluded that project initiation management positively and significantly influences the performance of selected mega-dam projects in Kenya. This study therefore recommends that project managers should give priority to project initiation management
调查项目启动管理对大型水坝项目绩效的影响:肯尼亚的经验证据
包括特大型水坝在内的大型项目的绩效可能与严格遵守项目生命周期(PLC)阶段有关,同时也要考虑到诸如人口迁移和自然生态系统干扰等风险。了解这些风险有助于项目经理和利益相关者做出明智的决策,从而从长远来看为项目留下积极的影响。研究的主要目的是确定项目启动管理如何影响肯尼亚巨型水坝项目的绩效。本研究以实证主义研究理念为指导。采用了描述性横截面调查研究设计。在本研究中,分析单位是水利、卫生和灌溉部(MoWSI)列出的肯尼亚各地启动和完成的 18 个超大型水坝项目,而观察单位则是水利、卫生和灌溉部的三位官员(项目经理、项目工程师、地理空间工程师)。对肯尼亚已建成的所有巨型水坝进行了普查。此外,研究还有的放矢地采访了 5 位主要利益相关者,包括内阁秘书、水利和基础设施部常务秘书、捐助者、承包商,以及从目标巨型水坝所在社区随机抽取的一位受益者。这构成了总计 180 个受访者的样本量。原始数据的收集使用了半结构化问卷和关键信息提供者访谈 (KII) 指南。来自多个来源和角度的定量和定性数据提供了更加全面和可靠的理解。为确定工具的有效性和可靠性,我们通过试点测试的方式进行了预先测试。描述性和推论性统计用于总结和描述数据的主要特征,并得出结论和推论。相关性研究结果表明,肯尼亚某些特大型水坝项目的项目启动管理与绩效之间存在着密切的正相关关系(r= 0.874,p<0.05)。此外,回归结果表明,项目启动管理水平提高一个单位,这些特大型水坝项目的绩效就会提高 0.433 个单位。根据研究结果,本研究得出结论,项目启动管理对肯尼亚选定的特大型水坝项目的绩效具有积极而重要的影响。因此,本研究建议项目经理应优先考虑项目启动管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信