Analisis Risiko Keselamatan Konstruksi Pada Proyek Rehabilitasi Puskesmas Secang 2 Berdasarkan Sudut Pandang Kontraktor

Firdamarsha Benadikta, Fitri Nugraheni
{"title":"Analisis Risiko Keselamatan Konstruksi Pada Proyek Rehabilitasi Puskesmas Secang 2 Berdasarkan Sudut Pandang Kontraktor","authors":"Firdamarsha Benadikta, Fitri Nugraheni","doi":"10.55606/jsr.v2i1.2094","DOIUrl":null,"url":null,"abstract":"The accident rate of building construction projects in Indonesia reached 9 cases out of a total of 48 cases (20%) from 2017 to 2022. Out of these, 43 cases were attributed to technical negligence, 4 cases were due to natural factors, and 1 case is currently under investigation. Given the issues related to construction accidents, this research aims to identify construction safety variables that are likely to occur and subsequently conduct a risk level analysis. The research methodology employed is a case study, followed by a risk analysis based on the Ministry of Public Works and Housing Regulation No. 10 of 2021 regarding the Guidelines for Construction Safety Management Systems. The research findings indicate that out of 34 construction safety risk variables, there were 2 hazards (5.88%) classified as high risk (B), 22 hazards (64.71%) classified as medium risk (S), and 10 hazards (29.41%) classified as low risk (K).","PeriodicalId":514620,"journal":{"name":"Journal of Student Research","volume":"282 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Student Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55606/jsr.v2i1.2094","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The accident rate of building construction projects in Indonesia reached 9 cases out of a total of 48 cases (20%) from 2017 to 2022. Out of these, 43 cases were attributed to technical negligence, 4 cases were due to natural factors, and 1 case is currently under investigation. Given the issues related to construction accidents, this research aims to identify construction safety variables that are likely to occur and subsequently conduct a risk level analysis. The research methodology employed is a case study, followed by a risk analysis based on the Ministry of Public Works and Housing Regulation No. 10 of 2021 regarding the Guidelines for Construction Safety Management Systems. The research findings indicate that out of 34 construction safety risk variables, there were 2 hazards (5.88%) classified as high risk (B), 22 hazards (64.71%) classified as medium risk (S), and 10 hazards (29.41%) classified as low risk (K).
基于承包商视角的 Puskesmas Secang 2 号修复项目施工安全风险分析
2017年至2022年,印尼建筑施工项目共发生48起事故,事故率达到9起(20%)。其中,43 起归因于技术疏忽,4 起归因于自然因素,1 起目前正在调查中。鉴于建筑事故的相关问题,本研究旨在确定可能发生的建筑安全变量,并随后进行风险等级分析。所采用的研究方法是案例研究,然后根据公共工程和住房部 2021 年第 10 号法规《建筑安全管理系统指南》进行风险分析。研究结果表明,在 34 个建筑安全风险变量中,有 2 个危害(5.88%)被归类为高风险(B),22 个危害(64.71%)被归类为中风险(S),10 个危害(29.41%)被归类为低风险(K)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信