Building Maintenance Priority Decision Support System Using the Method Profile Matching

Oryza Lhara Sari, B. Basyaruddin, Uswatun Khasanah
{"title":"Building Maintenance Priority Decision Support System Using the Method Profile Matching","authors":"Oryza Lhara Sari, B. Basyaruddin, Uswatun Khasanah","doi":"10.32832/astonjadro.v13i1.14495","DOIUrl":null,"url":null,"abstract":"Along with the increasing age of a building, maintenance activities become things that need to be done to minimize damage that occurs such as damage to the ceiling or ceramics. Therefore, this study aims to determine the priority of building elements in the treatment of architectural components in buildings A and B ITK campus using Profile Matching method. Based on the results of analysis and observations in the field, the elements that are the main priority in the architectural component of Building A are ceiling elements, the second priority element is sanitary elements, the third priority element is floor elements and door and window elements, the fourth priority element is painting elements, and the last priority element is Wall pair elements. Whereas in the architectural component of Building B, the main priority elements are ceiling elements and sanitary elements, the second priority element is the wall pair element, the third priority element is the floor element and the door and window element, and the last priority element is the painting element.","PeriodicalId":470409,"journal":{"name":"Astonjadro","volume":"42 12","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Astonjadro","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.32832/astonjadro.v13i1.14495","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Along with the increasing age of a building, maintenance activities become things that need to be done to minimize damage that occurs such as damage to the ceiling or ceramics. Therefore, this study aims to determine the priority of building elements in the treatment of architectural components in buildings A and B ITK campus using Profile Matching method. Based on the results of analysis and observations in the field, the elements that are the main priority in the architectural component of Building A are ceiling elements, the second priority element is sanitary elements, the third priority element is floor elements and door and window elements, the fourth priority element is painting elements, and the last priority element is Wall pair elements. Whereas in the architectural component of Building B, the main priority elements are ceiling elements and sanitary elements, the second priority element is the wall pair element, the third priority element is the floor element and the door and window element, and the last priority element is the painting element.
使用轮廓匹配法的建筑维护优先级决策支持系统
随着建筑物使用年限的增加,维护活动成为必须要做的事情,以尽量减少发生的损坏,如天花板或陶瓷的损坏。因此,本研究旨在利用轮廓匹配法确定 ITK 校园 A 号楼和 B 号楼建筑构件处理过程中建筑构件的优先级。根据分析结果和实地观察,在 A 号楼的建筑构件中,主要优先考虑的构件是天花板构件,第二优先考虑的构件是卫生构件,第三优先考虑的构件是地板构件和门窗构件,第四优先考虑的构件是油漆构件,最后优先考虑的构件是墙对构件。而在 B 楼的建筑构件中,主要优先元素是天花板元素和卫生元素,第二优先元素是墙对元素,第三优先元素是地板元素和门窗元素,最后优先元素是油漆元素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书