Hazard Identification Using Task Risk Assessment Method and Bowtie Analysis (Case Study: PT. Varia Usaha Beton)

Jurnal Sistem, T. Industri, Hasyim Asyari, Dika Setianingsih
{"title":"Hazard Identification Using Task Risk Assessment Method and Bowtie Analysis (Case Study: PT. Varia Usaha Beton)","authors":"Jurnal Sistem, T. Industri, Hasyim Asyari, Dika Setianingsih","doi":"10.32734/jsti.v26i1.14417","DOIUrl":null,"url":null,"abstract":"PT. Varia Usaha Beton is a subsidiary of PT. Semen Indonesia Beton, which produces various types of products. PT Varia Usaha Beton (BSP Purwokerto) has an open work area where there are potential hazards such as physical factors, chemical factors and ergonomic factors. The aim of this research is to identify hazards, assess risks and control risks in the production process of ready-mixed concrete so that workplace accidents can be minimized. The methods used in this research are task risk assessment and bowtie analysis. Based on the research results, it was found that 1 risk belonged to the low category, 27 risks belonged to the medium category, and 11 risks belonged to the high category. Based on the bow-tie method, the major risks are exposure to fly ash and cement dust, risk of diesel spills, and risk of electric shock. The main causes of workplace accidents are pipe leaks and improper diesel filling. The main risk effects of workplace accidents are worker injury, and fire. The bowtie analysis method determines that the risk of electric shock is due to a damaged cable and the existing protective barrier is intended to replace the damaged cable. This risk has consequences, namely injuries to workers.","PeriodicalId":221079,"journal":{"name":"Jurnal Sistem Teknik Industri","volume":"60 31","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sistem Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32734/jsti.v26i1.14417","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT. Varia Usaha Beton is a subsidiary of PT. Semen Indonesia Beton, which produces various types of products. PT Varia Usaha Beton (BSP Purwokerto) has an open work area where there are potential hazards such as physical factors, chemical factors and ergonomic factors. The aim of this research is to identify hazards, assess risks and control risks in the production process of ready-mixed concrete so that workplace accidents can be minimized. The methods used in this research are task risk assessment and bowtie analysis. Based on the research results, it was found that 1 risk belonged to the low category, 27 risks belonged to the medium category, and 11 risks belonged to the high category. Based on the bow-tie method, the major risks are exposure to fly ash and cement dust, risk of diesel spills, and risk of electric shock. The main causes of workplace accidents are pipe leaks and improper diesel filling. The main risk effects of workplace accidents are worker injury, and fire. The bowtie analysis method determines that the risk of electric shock is due to a damaged cable and the existing protective barrier is intended to replace the damaged cable. This risk has consequences, namely injuries to workers.
使用任务风险评估法和艏鳍分析法进行危险识别(案例研究:PT.)
PT.Varia Usaha Beton 是 PT.Semen Indonesia Beton 公司的子公司,该公司生产各类产品。PT Varia Usaha Beton(BSP Purwokerto)拥有一个开放式工作区,该工作区存在物理因素、化学因素和人体工程学因素等潜在危险。本研究的目的是识别预拌混凝土生产过程中的危害、评估风险并控制风险,从而最大限度地减少工伤事故。本研究采用的方法是任务风险评估和弓形分析。研究结果显示,1 项风险属于低风险,27 项风险属于中风险,11 项风险属于高风险。根据领结法,主要风险是接触粉煤灰和水泥粉尘、柴油泄漏风险和触电风险。工伤事故的主要原因是管道泄漏和柴油加注不当。工伤事故的主要风险影响是工人受伤和火灾。弓形分析法确定,电击风险是由于电缆受损造成的,而现有的保护屏障旨在取代受损的电缆。这种风险会造成后果,即工人受伤。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信