{"title":"An EOQ Model Under the Condition of Permissible Delay in Payments with Allowed Stock-Out Cost and Lead Time","authors":"Jayanthi J","doi":"10.37256/cm.5120242462","DOIUrl":null,"url":null,"abstract":"From this present study, derive the two consecutive demands between the time intervals: economic order quantity and total annual variable cost. The solution for this inventory model is optimizing the total annual variable cost. Here, given an arithmetical example and sensitivity analysis for the provision of the inventory model, assume the planning horizon and replenishment rate are infinite. To the best of our knowledge, this is the first study to find out the total annual variable cost using various costs under the condition of a permissible delay in payments with an allowed stock-out cost and lead time.","PeriodicalId":504505,"journal":{"name":"Contemporary Mathematics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Contemporary Mathematics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37256/cm.5120242462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

From this present study, derive the two consecutive demands between the time intervals: economic order quantity and total annual variable cost. The solution for this inventory model is optimizing the total annual variable cost. Here, given an arithmetical example and sensitivity analysis for the provision of the inventory model, assume the planning horizon and replenishment rate are infinite. To the best of our knowledge, this is the first study to find out the total annual variable cost using various costs under the condition of a permissible delay in payments with an allowed stock-out cost and lead time.
允许延迟付款条件下的 EOQ 模型与允许的缺货成本和周转时间
通过本研究,可以得出时间间隔之间的两个连续需求:经济订货量和年度可变总成本。该库存模型的解决方案是优化年度可变总成本。在此,我们给出了一个计算实例,并对库存模型的提供进行了敏感性分析,假设计划期限和补货率都是无限的。据我们所知,这是首次研究在允许延迟付款、允许缺货成本和交货时间的条件下,利用各种成本找出年度可变总成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信