Automated CAD-to-BIM generation of restroom sanitary plumbing system

Minso Shin, Seonghun Park, Bonsang Koo, Tae Wan Kim
{"title":"Automated CAD-to-BIM generation of restroom sanitary plumbing system","authors":"Minso Shin, Seonghun Park, Bonsang Koo, Tae Wan Kim","doi":"10.1093/jcde/qwae021","DOIUrl":null,"url":null,"abstract":"\n Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.","PeriodicalId":513408,"journal":{"name":"J. Comput. Des. Eng.","volume":"601 1","pages":"70-84"},"PeriodicalIF":0.0000,"publicationDate":"2024-02-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"J. Comput. Des. Eng.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/jcde/qwae021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.
自动生成从 CAD 到 BIM 的洗手间卫生管道系统
由于重复性工作过多、缺乏 BIM 熟练工人、频繁的 BIM 重现等原因,机械、电气和给排水(MEP)系统专家在将计算机辅助设计(CAD)中的设计转换为建筑信息模型(BIM)时经常遇到困难。因此,本研究旨在将 MEP 系统的 CAD 到 BIM 流程正规化,重点是卫生给排水系统,包括土壤、排水系统、热水供应和冷水供应系统。每个系统的流程都由以下五个常见模块组合而成:管道处理模块、管道连接模块、初始水平设置模块、增加立管接头模块和冲突解决模块。因此,根据正规化流程开发的原型生成了与 CAD 图纸完全一致且无冲突的卫生管道 BIM 模型。本研究通过确定卫生冷热水管道系统从 CAD 到 BIM 转换的注意事项以及反映这些注意事项的正规化流程,为 MEP BIM 理论做出了贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信