Minso Shin, Seonghun Park, Bonsang Koo, Tae Wan Kim
{"title":"Automated CAD-to-BIM generation of restroom sanitary plumbing system","authors":"Minso Shin, Seonghun Park, Bonsang Koo, Tae Wan Kim","doi":"10.1093/jcde/qwae021","DOIUrl":null,"url":null,"abstract":"\n Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.","PeriodicalId":513408,"journal":{"name":"J. Comput. Des. Eng.","volume":"601 1","pages":"70-84"},"PeriodicalIF":0.0000,"publicationDate":"2024-02-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"J. Comput. Des. Eng.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/jcde/qwae021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.