Implementation of Policy Regulation of The Head of The National Land Agency Number 5 of 2012 Concerning Technical Instructions For The Implementation of Land Procurement

Abriyanto Nugroho, Agus Priyanto3, Universitas Merdeka Surabaya
{"title":"Implementation of Policy Regulation of The Head of The National Land Agency Number 5 of 2012 Concerning Technical Instructions For The Implementation of Land Procurement","authors":"Abriyanto Nugroho, Agus Priyanto3, Universitas Merdeka Surabaya","doi":"10.55173/yurisdiksi.v19i4.226","DOIUrl":null,"url":null,"abstract":"That this research aims to analyze more deeply the implementation of the policy of the Head of the National Land Agency Regulation Number 5 of 2012 concerning Technical Instructions for Implementing Land Acquisition Case study of Land Acquisition for the Construction of the Pekanbaru-Bangkinang Toll Road, Riau Province. The research method in this legal research uses qualitative methods. The problem formulation used in this research is how to implement the policy of Regulation of the Head of the National Land Agency Number 5 of 2012 concerning Technical Instructions for Implementing Land Acquisition and what factors hinder the implementation of the policy of Regulation of the Head of the National Land Agency Number 5 of 2012 concerning Technical Instructions for Implementing Land Acquisition. That the results of this research found that the implementation of land acquisition for the construction of the Pekanbaru-Bangkinang toll road in Riau province was not optimal, that there were obstacles in the implementation of land acquisition for the construction of the toll road in the form of land disputes, the location being included in a forest area, and resistance from residents to the development. the toll road. The conclusion of this research is that it is best to review the regulations of the Head of the National Land Agency Number 5 of 2012 concerning Technical Instructions for the Implementation of Land Acquisition which function as a fulfillment of solving public problems in the land sector and filling legal gaps if necessary and that regarding the obstacles that In the field, assistance should be provided with related officials such as the prosecutor's office and police as well as the local district court to provide a sense of security and comfort for the committee and other stakeholders involved in the land acquisition process for the public interest.","PeriodicalId":517558,"journal":{"name":"YURISDIKSI : Jurnal Wacana Hukum dan Sains","volume":" 6","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"YURISDIKSI : Jurnal Wacana Hukum dan Sains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55173/yurisdiksi.v19i4.226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

That this research aims to analyze more deeply the implementation of the policy of the Head of the National Land Agency Regulation Number 5 of 2012 concerning Technical Instructions for Implementing Land Acquisition Case study of Land Acquisition for the Construction of the Pekanbaru-Bangkinang Toll Road, Riau Province. The research method in this legal research uses qualitative methods. The problem formulation used in this research is how to implement the policy of Regulation of the Head of the National Land Agency Number 5 of 2012 concerning Technical Instructions for Implementing Land Acquisition and what factors hinder the implementation of the policy of Regulation of the Head of the National Land Agency Number 5 of 2012 concerning Technical Instructions for Implementing Land Acquisition. That the results of this research found that the implementation of land acquisition for the construction of the Pekanbaru-Bangkinang toll road in Riau province was not optimal, that there were obstacles in the implementation of land acquisition for the construction of the toll road in the form of land disputes, the location being included in a forest area, and resistance from residents to the development. the toll road. The conclusion of this research is that it is best to review the regulations of the Head of the National Land Agency Number 5 of 2012 concerning Technical Instructions for the Implementation of Land Acquisition which function as a fulfillment of solving public problems in the land sector and filling legal gaps if necessary and that regarding the obstacles that In the field, assistance should be provided with related officials such as the prosecutor's office and police as well as the local district court to provide a sense of security and comfort for the committee and other stakeholders involved in the land acquisition process for the public interest.
国家土地局局长 2012 年第 5 号政策法规《关于实施土地采购的技术说明》的实施情况
本研究旨在更深入地分析廖内省北干巴鲁-邦吉南收费公路建设征地案例研究中国家土地局局长 2012 年第 5 号条例《实施土地征用技术说明》政策的执行情况。本法律研究采用定性研究方法。本研究中使用的问题表述方式是:如何执行国家土地局局长 2012 年第 5 号条例中关于执行土地征用技术说明的政策,以及哪些因素阻碍了国家土地局局长 2012 年第 5 号条例中关于执行土地征用技术说明的政策的执行。研究结果表明,廖内省北干巴鲁-邦吉南收费公路的征地工作并不理想,在征地过程中存在土地纠纷、征地地点位于林区、居民抵制收费公路开发等障碍。本研究的结论是,最好重新审议国家土地局局长 2012 年第 5 号条例《土地征用实施技术指 令》,该条例的作用是解决土地领域的公共问题,并在必要时填补法律空白,而对于实地存 在的障碍,应向检察院、警察局和地方法院等相关官员提供协助,以便为委员会和其他涉及公 共利益的土地征用过程的利益相关者提供安全感和舒适感。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信