{"title":"APPROVAL OF THE NEED FOR THE RECONSTRUCTION OF ARENI PUMPING STATION","authors":"Albert Margaryan, V. Tokmajyan, Davit Madoyan","doi":"10.56243/18294898-2024.1-98","DOIUrl":null,"url":null,"abstract":"The Areni-Khachik pumping station raises the waters of the Arpa river from the 976 m mark to the pressure basin located at the 2012 m mark of the upper mountain pass of the Khachik village, from which the water was given to the Khachik community with a maximum output of 415 l/s and to the Amaghu village with a maximum of 41 l/s. with output.\nThe pumping station has three stages, the engine rooms of which are located: First stage, on the right bank of the Arpa river at the mark of 975 m, with a geodetic pumping height of 318 m, pumping output of 582 l/s. Second stage: at the 1295 m mark of the site near the Areni-Khachik highway, with a geodetic elevation of 370 m, pumping output of 456 l/s . And the third stage: at the site of 1651 m near the Areni-Khachik highway, with a geodetic elevation of 361 m, pumping output of 456 l /v .\nAll three stages of the pumping station belong to the class of high-pressure pumping stations, with a relatively small discharge output and high pressure, the specific power consumption of which is significantly higher. Analyzing the technical condition of the pumping station, a program is proposed to implement its reconstruction and reduce operating costs.","PeriodicalId":472444,"journal":{"name":"BULLETIN OF HIGH TECHNOLOGY","volume":"15 9","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"BULLETIN OF HIGH TECHNOLOGY","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.56243/18294898-2024.1-98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The Areni-Khachik pumping station raises the waters of the Arpa river from the 976 m mark to the pressure basin located at the 2012 m mark of the upper mountain pass of the Khachik village, from which the water was given to the Khachik community with a maximum output of 415 l/s and to the Amaghu village with a maximum of 41 l/s. with output.
The pumping station has three stages, the engine rooms of which are located: First stage, on the right bank of the Arpa river at the mark of 975 m, with a geodetic pumping height of 318 m, pumping output of 582 l/s. Second stage: at the 1295 m mark of the site near the Areni-Khachik highway, with a geodetic elevation of 370 m, pumping output of 456 l/s . And the third stage: at the site of 1651 m near the Areni-Khachik highway, with a geodetic elevation of 361 m, pumping output of 456 l /v .
All three stages of the pumping station belong to the class of high-pressure pumping stations, with a relatively small discharge output and high pressure, the specific power consumption of which is significantly higher. Analyzing the technical condition of the pumping station, a program is proposed to implement its reconstruction and reduce operating costs.