APPROVAL OF THE NEED FOR THE RECONSTRUCTION OF ARENI PUMPING STATION

Albert Margaryan, V. Tokmajyan, Davit Madoyan
{"title":"APPROVAL OF THE NEED FOR THE RECONSTRUCTION OF ARENI PUMPING STATION","authors":"Albert Margaryan, V. Tokmajyan, Davit Madoyan","doi":"10.56243/18294898-2024.1-98","DOIUrl":null,"url":null,"abstract":"The Areni-Khachik pumping station raises the waters of the Arpa river from the 976 m mark to the pressure basin located at the 2012 m mark of the upper mountain pass of the Khachik village, from which the water was given to the Khachik community with a maximum output of 415 l/s and to the Amaghu village with a maximum of 41 l/s. with output.\nThe pumping station has three stages, the engine rooms of which are located: First stage, on the right bank of the Arpa river at the mark of 975 m, with a geodetic pumping height of 318 m, pumping output of 582 l/s. Second stage: at the 1295 m mark of the site near the Areni-Khachik highway, with a geodetic elevation of 370 m, pumping output of 456 l/s . And the third stage: at the site of 1651 m near the Areni-Khachik highway, with a geodetic elevation of 361 m, pumping output of 456 l /v .\nAll three stages of the pumping station belong to the class of high-pressure pumping stations, with a relatively small discharge output and high pressure, the specific power consumption of which is significantly higher. Analyzing the technical condition of the pumping station, a program is proposed to implement its reconstruction and reduce operating costs.","PeriodicalId":472444,"journal":{"name":"BULLETIN OF HIGH TECHNOLOGY","volume":"15 9","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"BULLETIN OF HIGH TECHNOLOGY","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.56243/18294898-2024.1-98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Areni-Khachik pumping station raises the waters of the Arpa river from the 976 m mark to the pressure basin located at the 2012 m mark of the upper mountain pass of the Khachik village, from which the water was given to the Khachik community with a maximum output of 415 l/s and to the Amaghu village with a maximum of 41 l/s. with output. The pumping station has three stages, the engine rooms of which are located: First stage, on the right bank of the Arpa river at the mark of 975 m, with a geodetic pumping height of 318 m, pumping output of 582 l/s. Second stage: at the 1295 m mark of the site near the Areni-Khachik highway, with a geodetic elevation of 370 m, pumping output of 456 l/s . And the third stage: at the site of 1651 m near the Areni-Khachik highway, with a geodetic elevation of 361 m, pumping output of 456 l /v . All three stages of the pumping station belong to the class of high-pressure pumping stations, with a relatively small discharge output and high pressure, the specific power consumption of which is significantly higher. Analyzing the technical condition of the pumping station, a program is proposed to implement its reconstruction and reduce operating costs.
批准重建阿尼抽水站的必要性
阿雷尼-卡奇克泵站将阿尔帕河水从 976 米处提升到位于卡奇克村上山口 2012 米处的压力池,从这里向卡奇克社区供水,最大输出量为 415 升/秒,向阿马古村供水,最大输出量为 41 升/秒:第一级:位于阿尔帕河右岸 975 米处,大地测量抽水高度为 318 米,抽水流量为 582 升/秒。第二阶段:位于阿雷尼-卡奇克公路附近 1295 米处,大地测量高度为 370 米,抽水流量为 456 升/秒。三级泵站均属于高压泵站,排出量相对较小,压力较高,耗电量较大。通过分析该泵站的技术状况,提出了对其进行改造并降低运行成本的方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信