Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani

Manajemen Waktu, Pada Pekerjaan, Arsitektur Proyek, Pembangunan Gedung, Yayasan Pelita, Ilmu Insani, . Windi1, Ahmad Aguswin, Akhmad Akromusyuhada
{"title":"Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani","authors":"Manajemen Waktu, Pada Pekerjaan, Arsitektur Proyek, Pembangunan Gedung, Yayasan Pelita, Ilmu Insani, . Windi1, Ahmad Aguswin, Akhmad Akromusyuhada","doi":"10.37034/infeb.v6i1.801","DOIUrl":null,"url":null,"abstract":"The success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Foundation Building Construction Project, especially architectural work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540 [1]. The S curve is used to find out how long a project takes to complete. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.","PeriodicalId":242689,"journal":{"name":"Jurnal Informatika Ekonomi Bisnis","volume":"11 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Informatika Ekonomi Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37034/infeb.v6i1.801","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Foundation Building Construction Project, especially architectural work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540 [1]. The S curve is used to find out how long a project takes to complete. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.
Pelita Ilmu Insani 基金会建筑施工项目的时间管理
一个项目的成败可能会受到项目活动缺乏规划的影响,而开展的监督工作效果不佳,又会影响项目的低效运行。这将导致工作延误和质量下降,并影响项目预算的膨胀。从项目实施到项目结束,都需要对项目进行管理。本研究以 Pelita Ilmu 基金会大楼建设项目(尤其是建筑工程)为案例进行研究。该建筑位于 Jl.Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540 [1]。S 曲线用于确定一个项目完成所需的时间。本研究的目的是根据 S 曲线图确定时间效率。使用 S 曲线图进行时间管理分析的结果表明,时间延误的实现与计划不符。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信