Reasonable Treatment Range of Karst Cave Encountered by Super-Large Diameter Shield Tunnel in Strongly Karst-Developed Area

IF 16.4 1区 化学 Q1 CHEMISTRY, MULTIDISCIPLINARY
Jiang Wang, Jinwen Yang, Xianglin Yan
{"title":"Reasonable Treatment Range of Karst Cave Encountered by Super-Large Diameter Shield Tunnel in Strongly Karst-Developed Area","authors":"Jiang Wang, Jinwen Yang, Xianglin Yan","doi":"10.1155/2024/9994801","DOIUrl":null,"url":null,"abstract":"When a super-large diameter shield tunnel passes through a strongly karst-developed area, in order to ensure the stability of the tunnel and economy of karst reinforcement, the reasonable treatment range for a huge number of karst caves needs to be researched. Based on a karst treatment project of a shield tunnel with a diameter of 14.5 m, this paper studies the influence of intrusive fully filled karst caves on the stability of the lining and excavation face by using theoretical calculation. In addition, the safe distance between the tunnel and karst caves outside the tunnel is proposed through numerical simulation, and the corresponding treatment range is obtained. The results show that the bearing capacity of the lining has a certain reserve when the intrusive cave is smaller than a certain size, and the caves filled with plastic or hard plastic clay have sufficient antifracturing ability. Therefore, some small fully filled caves inside the tunnel profile can be left unreinforced. On the other side, the critical safe distance is only 1–2 m for the caves with a size of 3 m, so the outside caves with a size less than 3 m can be left unreinforced in the treatment range farther away from the tunnel. The proposed treatment range is close to similar projects that have been built, indicating that analysis results are reasonable.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2024-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1155/2024/9994801","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

When a super-large diameter shield tunnel passes through a strongly karst-developed area, in order to ensure the stability of the tunnel and economy of karst reinforcement, the reasonable treatment range for a huge number of karst caves needs to be researched. Based on a karst treatment project of a shield tunnel with a diameter of 14.5 m, this paper studies the influence of intrusive fully filled karst caves on the stability of the lining and excavation face by using theoretical calculation. In addition, the safe distance between the tunnel and karst caves outside the tunnel is proposed through numerical simulation, and the corresponding treatment range is obtained. The results show that the bearing capacity of the lining has a certain reserve when the intrusive cave is smaller than a certain size, and the caves filled with plastic or hard plastic clay have sufficient antifracturing ability. Therefore, some small fully filled caves inside the tunnel profile can be left unreinforced. On the other side, the critical safe distance is only 1–2 m for the caves with a size of 3 m, so the outside caves with a size less than 3 m can be left unreinforced in the treatment range farther away from the tunnel. The proposed treatment range is close to similar projects that have been built, indicating that analysis results are reasonable.
强岩溶发育地区超大直径盾构隧道遇到的岩溶洞合理处理范围
当超大直径盾构隧道穿越强岩溶发育区时,为保证隧道的稳定性和岩溶加固的经济性,需要研究大量岩溶洞穴的合理处理范围。本文以某直径为 14.5 米的盾构隧道岩溶处理工程为基础,通过理论计算,研究了侵入性全充填岩溶洞穴对衬砌和开挖面稳定性的影响。此外,还通过数值模拟提出了隧道与隧道外岩溶洞穴的安全距离,并得出了相应的处理范围。结果表明,当侵入性溶洞小于一定规模时,衬砌的承载力有一定的储备,而充填可塑或硬塑粘土的溶洞有足够的抗裂能力。因此,隧道剖面内的一些小型全填充洞穴可以不进行加固。另一方面,对于 3 米大小的洞穴,临界安全距离仅为 1-2 米,因此在离隧道较远的处理范围内,可以不对洞穴外侧小于 3 米的洞穴进行加固。建议的处理范围与已建的类似工程接近,说明分析结果是合理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Accounts of Chemical Research
Accounts of Chemical Research 化学-化学综合
CiteScore
31.40
自引率
1.10%
发文量
312
审稿时长
2 months
期刊介绍: Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance. Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信