Bridge Approach Settlement and its Mitigation Schemes: A Review

Bhaskar Prakash, Anoop Kumar Tiwari, Suresh R. Dash
{"title":"Bridge Approach Settlement and its Mitigation Schemes: A Review","authors":"Bhaskar Prakash, Anoop Kumar Tiwari, Suresh R. Dash","doi":"10.1177/03611981231220630","DOIUrl":null,"url":null,"abstract":"The primary function of the bridge approach is to provide a seamless transition from the highway or railway embankment to the bridge structure. However, a sudden change in elevation (drop/bump) at the transit of these two has often been observed. This sudden drop/bump acts as a potential cause for motorist discomfort, impact on the bridge deck, and cracks on the pavement surface. This phenomenon of ground settlement or deformation that can occur near the approach or abutment of a bridge for various reasons is often referred to as bridge approach settlement (BAS). Several researchers have contributed to formulating the reasons behind BAS and have proposed several mitigation techniques. This manuscript provides a comprehensive literature review on the causes of BAS, the contribution of various research works on mitigation techniques, and experimental, numerical, and field studies of various BAS mitigation schemes. The causes and mitigation techniques are categorized based on major components of the bridge structure, that is, the foundation, abutment, backfill soil, bridge approach, and bridge deck interface. Each of these mitigation schemes has advantages and disadvantages, and the best approach will depend on several factors, such as the type of soil, the loading conditions, and the design of the bridge and its approaches. The feasibility of various mitigation schemes is also reviewed with respect to their efficacy and ease of use.","PeriodicalId":509035,"journal":{"name":"Transportation Research Record: Journal of the Transportation Research Board","volume":"44 11","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Research Record: Journal of the Transportation Research Board","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/03611981231220630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The primary function of the bridge approach is to provide a seamless transition from the highway or railway embankment to the bridge structure. However, a sudden change in elevation (drop/bump) at the transit of these two has often been observed. This sudden drop/bump acts as a potential cause for motorist discomfort, impact on the bridge deck, and cracks on the pavement surface. This phenomenon of ground settlement or deformation that can occur near the approach or abutment of a bridge for various reasons is often referred to as bridge approach settlement (BAS). Several researchers have contributed to formulating the reasons behind BAS and have proposed several mitigation techniques. This manuscript provides a comprehensive literature review on the causes of BAS, the contribution of various research works on mitigation techniques, and experimental, numerical, and field studies of various BAS mitigation schemes. The causes and mitigation techniques are categorized based on major components of the bridge structure, that is, the foundation, abutment, backfill soil, bridge approach, and bridge deck interface. Each of these mitigation schemes has advantages and disadvantages, and the best approach will depend on several factors, such as the type of soil, the loading conditions, and the design of the bridge and its approaches. The feasibility of various mitigation schemes is also reviewed with respect to their efficacy and ease of use.
桥梁引桥沉降及其缓解方案:综述
引桥的主要功能是提供从公路或铁路路堤到桥梁结构的无缝过渡。然而,在这两者的交接处,经常会观察到高程的突然变化(下降/颠簸)。这种突降/突起可能会造成驾驶者不适、对桥面的冲击以及路面裂缝。这种由于各种原因在引桥或桥台附近发生的地面沉降或变形现象通常被称为引桥沉降 (BAS)。一些研究人员对 BAS 背后的原因做出了解释,并提出了一些缓解技术。本手稿对 BAS 的成因、各种缓解技术研究成果以及各种 BAS 缓解方案的实验、数值和现场研究进行了全面的文献综述。根据桥梁结构的主要组成部分,即地基、桥台、回填土、引桥和桥面界面,对成因和缓解技术进行了分类。这些缓解方案各有利弊,最佳方案取决于多种因素,如土壤类型、荷载条件以及桥梁及其引桥的设计。此外,还就各种缓解方案的有效性和易用性对其可行性进行了审查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信