Installation Technique and Numerical Simulation of Stress on High-Pile Footings During the Translation of Offshore Booster Stations

Q3 Environmental Science
Maoqiang Zhou
{"title":"Installation Technique and Numerical Simulation of Stress on High-Pile Footings During the Translation of Offshore Booster Stations","authors":"Maoqiang Zhou","doi":"10.13052/spee1048-5236.4325","DOIUrl":null,"url":null,"abstract":"The foundation of the offshore substation mainly adopts the structure of a conductor support frame, and the installation of the upper blocks of the offshore substation mainly employs a lifting vessel for hoisting. The “Zhegen Sha 300 MW Offshore Wind Power Project” adopts a high-pile cap foundation for the offshore substation, making use of a translational installation method for the upper blocks. The innovative foundation design and installation scheme together form the basis of this project, which is explored in detail in this paper. Numerical simulations examining the bearing performance of the high-pile cap foundation during the translational process of the upper blocks are also performed, allowing finer insights into the design and construction of offshore wind power projects.","PeriodicalId":35712,"journal":{"name":"Strategic Planning for Energy and the Environment","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strategic Planning for Energy and the Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13052/spee1048-5236.4325","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 0

Abstract

The foundation of the offshore substation mainly adopts the structure of a conductor support frame, and the installation of the upper blocks of the offshore substation mainly employs a lifting vessel for hoisting. The “Zhegen Sha 300 MW Offshore Wind Power Project” adopts a high-pile cap foundation for the offshore substation, making use of a translational installation method for the upper blocks. The innovative foundation design and installation scheme together form the basis of this project, which is explored in detail in this paper. Numerical simulations examining the bearing performance of the high-pile cap foundation during the translational process of the upper blocks are also performed, allowing finer insights into the design and construction of offshore wind power projects.
海上升压站平移过程中高桩基底应力的安装技术和数值模拟
海上变电站基础主要采用导线支撑架结构,海上变电站上部构件安装主要采用起重船吊装。浙能沙 300 兆瓦海上风电项目 "海上变电站采用高桩帽基础,上部构件采用平移安装方式。创新的基础设计和安装方案共同构成了该项目的基础,本文对此进行了详细探讨。此外,还进行了数值模拟,检查了高桩帽地基在上部岩块平移过程中的承载性能,从而对海上风电项目的设计和施工有了更深入的了解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Strategic Planning for Energy and the Environment
Strategic Planning for Energy and the Environment Environmental Science-Environmental Science (all)
CiteScore
1.50
自引率
0.00%
发文量
25
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信