Assessing the Accident-Cost Relationship in Building Construction Projects Using Structural Equation Modeling

IF 1 Q4 ENGINEERING, CIVIL
Milad Ghanbari
{"title":"Assessing the Accident-Cost Relationship in Building Construction Projects Using Structural Equation Modeling","authors":"Milad Ghanbari","doi":"10.14525/jjce.v18i1.02","DOIUrl":null,"url":null,"abstract":"This study aimed to evaluate the accident-causing factors affecting the total cost of building construction projects using a structural-equation model (SEM). Through the analysis of 35 identified factors categorized into construction, natural disaster, physical and human and psychological domains, this study examined their effects on project costs. The data collected from 120 construction experts in Iraq was analyzed using the SmartPLS software. This study assessed the fit of the measurement model using the following key criteria: reliability, convergent validity and divergent validity. All latent constructs demonstrated Cronbach’s-alpha values of above 0.70 and composite-reliability (CR) values of above 0.70, indicating their reliability. The average variance extracted (AVE) values exceeded the 0.5 threshold, confirming convergent validity. The model also demonstrated acceptable discriminant validity. The results confirmed the significant impact of accident-causing factors on project costs, with \"excessive physical activity,\" \"storm,\" \"improper ventilation,\" \"low motivation and low efficiency of the workers,\" and \"fire, explosion and vibration\" emerging as the top five influencing factors. These findings emphasized the need for tailored safety measures to mitigate such risks. The study underscored the importance of addressing accident-causing factors to enhance both safety planning and financial outcomes in building construction projects. KEYWORDS: Accident-causing factors, Project cost, Construction-project management, Safety assessment, Structural-equation modeling","PeriodicalId":51814,"journal":{"name":"Jordan Journal of Civil Engineering","volume":" 26","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jordan Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14525/jjce.v18i1.02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

This study aimed to evaluate the accident-causing factors affecting the total cost of building construction projects using a structural-equation model (SEM). Through the analysis of 35 identified factors categorized into construction, natural disaster, physical and human and psychological domains, this study examined their effects on project costs. The data collected from 120 construction experts in Iraq was analyzed using the SmartPLS software. This study assessed the fit of the measurement model using the following key criteria: reliability, convergent validity and divergent validity. All latent constructs demonstrated Cronbach’s-alpha values of above 0.70 and composite-reliability (CR) values of above 0.70, indicating their reliability. The average variance extracted (AVE) values exceeded the 0.5 threshold, confirming convergent validity. The model also demonstrated acceptable discriminant validity. The results confirmed the significant impact of accident-causing factors on project costs, with "excessive physical activity," "storm," "improper ventilation," "low motivation and low efficiency of the workers," and "fire, explosion and vibration" emerging as the top five influencing factors. These findings emphasized the need for tailored safety measures to mitigate such risks. The study underscored the importance of addressing accident-causing factors to enhance both safety planning and financial outcomes in building construction projects. KEYWORDS: Accident-causing factors, Project cost, Construction-project management, Safety assessment, Structural-equation modeling
利用结构方程模型评估建筑施工项目中的事故与成本关系
本研究旨在利用结构方程模型(SEM)评估影响建筑施工项目总成本的事故致因。本研究通过对已确定的 35 个因素进行分析,将其分为建筑、自然灾害、物理和人及心理领域,研究了这些因素对项目成本的影响。本研究使用 SmartPLS 软件对从伊拉克 120 名建筑专家处收集的数据进行了分析。本研究使用以下主要标准对测量模型的拟合度进行了评估:信度、收敛效度和发散效度。所有潜在构念的 Cronbach's-alpha 值均高于 0.70,复合可信度 (CR) 值均高于 0.70,表明其可信度较高。平均方差提取(AVE)值超过了 0.5 的临界值,证实了收敛效度。该模型还显示了可接受的判别效度。结果证实了事故诱因对项目成本的重大影响,其中 "过度体力活动"、"暴风雨"、"通风不当"、"工人积极性低和效率低 "以及 "火灾、爆炸和振动 "成为前五大影响因素。这些发现强调了采取有针对性的安全措施来降低此类风险的必要性。研究强调了解决事故致因的重要性,以加强建筑施工项目的安全规划和财务成果。关键词: 事故诱因 项目成本 建筑项目管理 安全评估 结构方程建模
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.10
自引率
27.30%
发文量
0
期刊介绍: I am very pleased and honored to be appointed as an Editor-in-Chief of the Jordan Journal of Civil Engineering which enjoys an excellent reputation, both locally and internationally. Since development is the essence of life, I hope to continue developing this distinguished Journal, building on the effort of all the Editors-in-Chief and Editorial Board Members as well as Advisory Boards of the Journal since its establishment about a decade ago. I will do my best to focus on publishing high quality diverse articles and move forward in the indexing issue of the Journal.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信