TIME COST TRADE OFF ANALYSIS ON PROJECT ACCELERATION WITH ADDITIONAL WORKING HOURS (OVERTIME) (CASE STUDY: BUILDING REHABILITATION PROJECT ON DEKRANASDA HALL OF WEST KALIMANTAN)

Yasra Azzahra, Lusiana Lusiana, Rafie Rafie, Syahrudin Syahrudin, Safaruddin M. Nuh
{"title":"TIME COST TRADE OFF ANALYSIS ON PROJECT ACCELERATION WITH ADDITIONAL WORKING HOURS (OVERTIME) (CASE STUDY: BUILDING REHABILITATION PROJECT ON DEKRANASDA HALL OF WEST KALIMANTAN)","authors":"Yasra Azzahra, Lusiana Lusiana, Rafie Rafie, Syahrudin Syahrudin, Safaruddin M. Nuh","doi":"10.26418/jts.v23i4.71535","DOIUrl":null,"url":null,"abstract":"Acceleration on projects is frequently used when there is a mismatch between the actual and planned schedules. In addition, acceleration is frequently implemented in response to requests from the project owner to complete the project as quickly as possible to meet specific goals so that the building can be used immediately. The owner of the Dekranasda Building and Hall in West Kalimantan requested that the project be finished immediately so that the Dekranasda Building could be used as the location for a national UMKM exhibition event. The initial plan for this project was scheduled for 152 working days. Because there would be an exhibition event, the project was accelerated to 128 working days. The purpose of this research is to accelerate the project for 24 days. The stages of this acceleration analysis start from finding what activities can be softened, then compiling a network diagram to identify activities on the critical path, followed by crashing analysis to get crash duration, crash cost, and cost slope, then Time Cost Trade-Off analysis is carried out. This research uses the PDM (Precedence Diagram Method) method applied to Microsoft Project to compile a Network Diagram. The results of the acceleration analysis show that the crashing process is carried out until the 12th crashing to meet the target acceleration duration of 128 working days from the normal duration of 152 working days, and the usual 24-day length is shortened. Twelve tasks have been added, raising the overall project cost from Rp. 6,794,007,874 to Rp. 7,091,725,614 by a total of Rp. 297,717,741.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/jts.v23i4.71535","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Acceleration on projects is frequently used when there is a mismatch between the actual and planned schedules. In addition, acceleration is frequently implemented in response to requests from the project owner to complete the project as quickly as possible to meet specific goals so that the building can be used immediately. The owner of the Dekranasda Building and Hall in West Kalimantan requested that the project be finished immediately so that the Dekranasda Building could be used as the location for a national UMKM exhibition event. The initial plan for this project was scheduled for 152 working days. Because there would be an exhibition event, the project was accelerated to 128 working days. The purpose of this research is to accelerate the project for 24 days. The stages of this acceleration analysis start from finding what activities can be softened, then compiling a network diagram to identify activities on the critical path, followed by crashing analysis to get crash duration, crash cost, and cost slope, then Time Cost Trade-Off analysis is carried out. This research uses the PDM (Precedence Diagram Method) method applied to Microsoft Project to compile a Network Diagram. The results of the acceleration analysis show that the crashing process is carried out until the 12th crashing to meet the target acceleration duration of 128 working days from the normal duration of 152 working days, and the usual 24-day length is shortened. Twelve tasks have been added, raising the overall project cost from Rp. 6,794,007,874 to Rp. 7,091,725,614 by a total of Rp. 297,717,741.
关于增加工时(加班)加快项目进度的时间成本权衡分析(案例研究:西 加里曼丹省德克拉纳斯达大厅建筑修复项目)
当实际工期与计划工期不匹配时,经常会采用加速工期。此外,项目业主要求尽快完成项目以实现特定目标,以便大楼能立即投入使用,加速也经常被采用。位于西加里曼丹的 Dekranasda 大楼和大厅的业主要求立即完成项目,以便 Dekranasda 大楼可用作 UMKM 全国展览活动的地点。该项目的最初计划是 152 个工作日。由于将举办展览活动,该项目被加速到 128 个工作日。本研究的目的是将项目加速 24 天。加速分析的各个阶段从寻找哪些活动可以软化开始,然后编制网络图以确定关键路径上的活动,接着进行碰撞分析以获得碰撞持续时间、碰撞成本和成本斜率,然后进行时间成本权衡分析。本研究使用了适用于 Microsoft Project 的 PDM(先行图法)方法来编制网络图。加速度分析结果表明,碰撞过程进行到第 12 次碰撞,达到了从正常工期 152 个工作日缩短到 128 个工作日的目标加速工期,缩短了通常的 24 天工期。增加了 12 项任务,使项目总费用从 6 794 007 874 印尼盾增加到 7 091 725 614 印尼盾,共增加 297 717 741 印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信