{"title":"Modeling and control of parameters of flow technologies with local hydraulic transport and coal dewatering based on analysis of the structure of the tunneling cycle","authors":"Yuriy Dmitrak, Victor Atrushkevich, Alexey Kravtsov","doi":"10.21177/1998-4502-2023-15-3-751-759","DOIUrl":null,"url":null,"abstract":"Introduction. The article discusses the issues of modeling various variants of flow line tunneling technologies based on an analysis of the structure of the tunneling cycle. Materials and methods. As research methods, the authors used: analysis of the structures of the tunneling cycle of continuous mining technologies, mathematical modeling of processes and operations, and industrial testing of options for implementing the proposed technological tunneling systems. Results. The results obtained during the implementation of the economic and mathematical model for the variant of the flow technology presented above showed that the following parameters of the technological scheme are optimal: technical productivity of the combine – 1.1 m3/min; process water consumption – 200 m3/h; number of drilling rigs – 2; the number of miner units is 6. The speed of development with these parameters of the flow technological scheme will be 880 m3/month, the labor productivity of miners is 14.8 m3/person during the work shift. Conclusion. The article summarizes the results of research on the development, justification of parameters and implementation of various options for in-line technologies for carrying out inclined workings with a hydraulic slope for various purposes for a wide range of conditions of their application. Resume. Implementation of the model proposed by the authors made it possible to determine the primary area of application of the considered version of the flow technology for carrying out preparatory workings in relation to the mining and geological conditions of the Kuzbass mines. Variants of the considered technological schemes for carrying out workings were implemented during the mining of reserves of the Anzherskaya-Yuzhnaya-3 mine, during the underground mining of reserves of the Listvyansky and Kedrovsky open-pit mines located in the Kemerovo region of the Russian Federation and the implementation of a project for the combined mining of a graphite deposit in middle Vietnam.Suggestions for practical application and direction for future research. The materials of the article may be useful for scientific and design organizations, coal mining enterprises in modeling and implementing precision mining technologies.","PeriodicalId":37608,"journal":{"name":"Sustainable Development of Mountain Territories","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable Development of Mountain Territories","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21177/1998-4502-2023-15-3-751-759","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction. The article discusses the issues of modeling various variants of flow line tunneling technologies based on an analysis of the structure of the tunneling cycle. Materials and methods. As research methods, the authors used: analysis of the structures of the tunneling cycle of continuous mining technologies, mathematical modeling of processes and operations, and industrial testing of options for implementing the proposed technological tunneling systems. Results. The results obtained during the implementation of the economic and mathematical model for the variant of the flow technology presented above showed that the following parameters of the technological scheme are optimal: technical productivity of the combine – 1.1 m3/min; process water consumption – 200 m3/h; number of drilling rigs – 2; the number of miner units is 6. The speed of development with these parameters of the flow technological scheme will be 880 m3/month, the labor productivity of miners is 14.8 m3/person during the work shift. Conclusion. The article summarizes the results of research on the development, justification of parameters and implementation of various options for in-line technologies for carrying out inclined workings with a hydraulic slope for various purposes for a wide range of conditions of their application. Resume. Implementation of the model proposed by the authors made it possible to determine the primary area of application of the considered version of the flow technology for carrying out preparatory workings in relation to the mining and geological conditions of the Kuzbass mines. Variants of the considered technological schemes for carrying out workings were implemented during the mining of reserves of the Anzherskaya-Yuzhnaya-3 mine, during the underground mining of reserves of the Listvyansky and Kedrovsky open-pit mines located in the Kemerovo region of the Russian Federation and the implementation of a project for the combined mining of a graphite deposit in middle Vietnam.Suggestions for practical application and direction for future research. The materials of the article may be useful for scientific and design organizations, coal mining enterprises in modeling and implementing precision mining technologies.
基于掘进循环结构分析的局部水力输运和煤炭脱水流动技术的建模和参数控制
导言文章在分析隧道挖掘周期结构的基础上,讨论了流水线隧道挖掘技术各种变体的建模问题。材料和方法。作为研究方法,作者使用了:连续采矿技术掘进循环结构分析、工艺和操作数学建模以及对拟议技术掘进系统实施方案的工业测试。研究结果在实施上述流动技术变体的经济和数学模型过程中获得的结果表明,该技术方案的以下参数为最佳参数:联合收割机的技术生产率 - 1.1 立方米/分钟;工艺用水量 - 200 立方米/小时;钻机数量 - 2 台;采矿机数量为 6 台。 根据流动技术方案的这些参数,开发速度将达到 880 立方米/月,矿工的劳动生产率为 14.8 立方米/人/班。结论文章总结了在各种应用条件下,为各种目的开发、论证参数和实施带有水力坡度的倾斜巷道在线技术的各种方案的研究成果。简历根据库兹巴斯矿山的采矿和地质条件,作者提出的模型可以确定所考虑的流体技术进行准备工作的主要应用领域。在开采 Anzherskaya-Yuzhnaya-3 矿的储量、位于俄罗斯联邦克麦罗沃州的 Listvyansky 和 Kedrovsky 露天矿的储量地下开采以及越南中部石墨矿床联合开采项目的实施过程中,采用了所考虑的各种施工技术方案。文章的材料可能对科学和设计机构、煤矿企业在建立模型和实施精确采矿技术方面有所帮助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Sustainable Development of Mountain Territories
Sustainable Development of Mountain Territories Social Sciences-Sociology and Political Science
CiteScore
2.40
自引率
0.00%
发文量
36
期刊介绍: International scientific journal "Sustainable development of mountain territories" covers fundamental and applied regional, national and international research and provides a platform to publish original full papers and related reviews in the following areas: engineering science and Earth science in the field of sustainable development of mountain territories. Main objectives of international scientific journal "Sustainable development of mountain territories" are: raising the level of professional scientific workers, teachers of higher educational institutions and scientific organizations; presentation of research results in the field of sustainable development of mountain areas on the technical aspects and Earth sciences, informing readers about the results of Russian and international scientific forums; improved review and editing of the articles submitted for publication; ensuring wide dissemination for the published articles in the international academic environment; encouraging dissemination and indexing of scientific works in various foreign key citation databases.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信