BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS

Q4 Earth and Planetary Sciences
Hang Thu Thi Le, Tinh Dinh Cong
{"title":"BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS","authors":"Hang Thu Thi Le, Tinh Dinh Cong","doi":"10.11113/aej.v13.19476","DOIUrl":null,"url":null,"abstract":"Cash flow calculation is an essential economic aspect of evaluating the success of a construction project. Strong cash flow positively impacts not only project effectiveness but also company profitability. Cash flow calculation is a good way for the contractors to avoid risks related to delay, cost overrun, or incompletion caused by financial deficits in the project’s performance. Building Information Modeling (BIM) is a revolutionary technology 4.0 that has been mandated and adopted by many countries all over the world. In Vietnam, a roadmap for BIM application in the construction sector was issued in 2023, under which obligatory new investment projects in public investment state capital provide BIM files to serve the appraisal of feasibility study reports, construction designs carried out after fundamental designs, applications for construction permits, and acceptance testing tasks. However, BIM authoring programming is still limited to cost management, especially cash flow calculations, because Vietnamese contractors are still facing a lot of difficulties in applying BIM to their projects, especially cash flow calculations. Therefore, this paper proposes a BIM-integrated system for calculating construction cash flow at the early phase of the project life cycle. The proposed system includes four modules: BIM visualization and data integration, construction cost estimating, construction project scheduling, and project cash flow calculation. The main functionality of the BIM visualization and data integration module is to provide a 3D visualized model with enough geometric and non-geometric data for the project quantity take-off. The functionality of the construction cost estimating module is to provide the direct cost categories, such as labor, material, and machine, and the indirect cost categories to perform all work tasks in the construction project. The main functionality of the construction project scheduling module is to provide the required time to complete all work tasks in the project implementation process. The main functionality of the project cash flow calculating module is to present cash inflows such as advance payment, payments from the owner, and cash outflows such as construction costs, equipment costs, project management costs, and project consultant costs to carry out the projects. The BIM-integrated system will make the calculation process of construction project cash flow easier and more accurate.","PeriodicalId":36749,"journal":{"name":"ASEAN Engineering Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-10-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/aej.v13.19476","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Cash flow calculation is an essential economic aspect of evaluating the success of a construction project. Strong cash flow positively impacts not only project effectiveness but also company profitability. Cash flow calculation is a good way for the contractors to avoid risks related to delay, cost overrun, or incompletion caused by financial deficits in the project’s performance. Building Information Modeling (BIM) is a revolutionary technology 4.0 that has been mandated and adopted by many countries all over the world. In Vietnam, a roadmap for BIM application in the construction sector was issued in 2023, under which obligatory new investment projects in public investment state capital provide BIM files to serve the appraisal of feasibility study reports, construction designs carried out after fundamental designs, applications for construction permits, and acceptance testing tasks. However, BIM authoring programming is still limited to cost management, especially cash flow calculations, because Vietnamese contractors are still facing a lot of difficulties in applying BIM to their projects, especially cash flow calculations. Therefore, this paper proposes a BIM-integrated system for calculating construction cash flow at the early phase of the project life cycle. The proposed system includes four modules: BIM visualization and data integration, construction cost estimating, construction project scheduling, and project cash flow calculation. The main functionality of the BIM visualization and data integration module is to provide a 3D visualized model with enough geometric and non-geometric data for the project quantity take-off. The functionality of the construction cost estimating module is to provide the direct cost categories, such as labor, material, and machine, and the indirect cost categories to perform all work tasks in the construction project. The main functionality of the construction project scheduling module is to provide the required time to complete all work tasks in the project implementation process. The main functionality of the project cash flow calculating module is to present cash inflows such as advance payment, payments from the owner, and cash outflows such as construction costs, equipment costs, project management costs, and project consultant costs to carry out the projects. The BIM-integrated system will make the calculation process of construction project cash flow easier and more accurate.
BIM 集成系统:估算建筑项目现金流的成功替代方案
现金流计算是评估建筑项目成功与否的一个重要经济方面。强劲的现金流不仅会对项目效益产生积极影响,还会对公司盈利能力产生积极影响。现金流计算是承包商规避因项目绩效中的财务赤字而导致延误、成本超支或无法完工等相关风险的好方法。建筑信息模型(BIM)是一项革命性的 4.0 技术,已被世界上许多国家强制采用。越南于 2023 年颁布了建筑行业 BIM 应用路线图,规定公共投资国有资本的新投资项目必须提供 BIM 文件,以服务于可行性研究报告评估、基础设计后的施工设计、施工许可证申请和验收测试任务。然而,BIM 编制程序仍局限于成本管理,特别是现金流计算,因为越南承包商在项目中应用 BIM,特别是现金流计算方面仍面临很多困难。因此,本文提出了一个 BIM 集成系统,用于在项目生命周期的早期阶段计算施工现金流。该系统包括四个模块:BIM 可视化和数据集成、施工成本估算、施工项目调度和项目现金流计算。BIM 可视化和数据集成模块的主要功能是为工程量核算提供包含足够几何和非几何数据的三维可视化模型。施工成本估算模块的功能是提供直接成本类别,如人工、材料和机械,以及执行施工项目中所有工作任务的间接成本类别。施工项目调度模块的主要功能是提供完成项目实施过程中所有工作任务所需的时间。项目现金流计算模块的主要功能是提供现金流入量,如预付款、业主支付的款项,以及现金流出量,如实施项目的建筑成本、设备成本、项目管理成本和项目顾问成本。BIM 集成系统将使建筑项目现金流的计算过程变得更加简单和准确。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
ASEAN Engineering Journal
ASEAN Engineering Journal Engineering-Engineering (all)
CiteScore
0.60
自引率
0.00%
发文量
75
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信