{"title":"ANALISIS PENGGUNAAN ALAT BERAT TERHADAP WAKTU DAN BIAYA (STUDI KASUS : PROYEK JALAN RAYA BABATBOJONEGORO KM 72-73)","authors":"I. Mayasari, Santi Ayu Sari","doi":"10.52166/dearsip.v3i02.5214","DOIUrl":null,"url":null,"abstract":"Roads are infrastructure built by the government to facilitate regional development so that they become assets that must be managed and function optimally. The transportation infrastructure and facilities system as a basic infrastructure is a prerequisite for the economic movement of the region, where the supporting system and transportation infrastructure drivers play a major role in the efficiency and effectiveness of regional economic activities. The purpose of this study is to determine the time and cost of using heavy equipment used in Babat-Bojonegoro Highway Project KM 72-73 completion on paving work. This research uses the work capacity analysis method, namely by calculating data to find the working capacity of the heavy equipment used, as a basis for calculating the time and cost required for heavy equipment in the implementation of paving work. From the analysis of the time required by heavy equipment in paving work with a volume of 3612 tons / m3 is 167,5 hours or 24 days. For the total cost of heavy equipment analyzed in paving work amounting to Rp. 405.486.106.","PeriodicalId":383919,"journal":{"name":"DEARSIP : Journal of Architecture and Civil","volume":"435 6","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"DEARSIP : Journal of Architecture and Civil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52166/dearsip.v3i02.5214","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Roads are infrastructure built by the government to facilitate regional development so that they become assets that must be managed and function optimally. The transportation infrastructure and facilities system as a basic infrastructure is a prerequisite for the economic movement of the region, where the supporting system and transportation infrastructure drivers play a major role in the efficiency and effectiveness of regional economic activities. The purpose of this study is to determine the time and cost of using heavy equipment used in Babat-Bojonegoro Highway Project KM 72-73 completion on paving work. This research uses the work capacity analysis method, namely by calculating data to find the working capacity of the heavy equipment used, as a basis for calculating the time and cost required for heavy equipment in the implementation of paving work. From the analysis of the time required by heavy equipment in paving work with a volume of 3612 tons / m3 is 167,5 hours or 24 days. For the total cost of heavy equipment analyzed in paving work amounting to Rp. 405.486.106.
使用重型设备对时间和成本的影响分析(案例研究:Babatbojonegoro 公路 72-73 公里项目)
道路是政府为促进区域发展而修建的基础设施,因此道路成为必须加以管理并发挥最佳功能的资产。交通基础设施和设施系统作为基本的基础设施,是区域经济运动的前提条件,其中的配套系统和交通基础设施驱动因素对区域经济活动的效率和效益起着重要作用。本研究的目的是确定在 Babat-Bojonegoro 公路项目 KM 72-73 完成铺路工作时使用重型设备的时间和成本。 本研究采用工作能力分析方法,即通过计算数据找出所用重型设备的工作能力,以此为基础计算重型设备在实施摊铺工作中所需的时间和成本。 根据分析,重型设备在摊铺 3612 吨/立方米的工程中所需的时间为 167.5 小时或 24 天。重型设备在摊铺工程中的总成本分析为 405.486.106 印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信