{"title":"A dam management problem with energy production as an optimal switching problem","authors":"Etienne Chevalier, Cristina Di Girolami, M'hamed Gaïgi, Elisa Giovannini, Simone Scotti","doi":"10.1002/asmb.2840","DOIUrl":null,"url":null,"abstract":"We consider an optimal stochastic control problem for a dam. Electrical power production is operating under an uncertain setting for electricity market prices and water level which has to be kept under control. Indeed, the water level inside the basin cannot exceed a certain threshold for safety reasons, and at the same time cannot decrease below another threshold in order to keep power production active. We model this situation as a mixed control problem with regular and switching controls under constraints. We characterize the value function as solution of an HJB equation and provide some numerical approximating methods. We shall illustrate by numerical examples the main achievements of the present approach.","PeriodicalId":55495,"journal":{"name":"Applied Stochastic Models in Business and Industry","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2023-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Stochastic Models in Business and Industry","FirstCategoryId":"100","ListUrlMain":"https://doi.org/10.1002/asmb.2840","RegionNum":4,"RegionCategory":"数学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MATHEMATICS, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0
Abstract
We consider an optimal stochastic control problem for a dam. Electrical power production is operating under an uncertain setting for electricity market prices and water level which has to be kept under control. Indeed, the water level inside the basin cannot exceed a certain threshold for safety reasons, and at the same time cannot decrease below another threshold in order to keep power production active. We model this situation as a mixed control problem with regular and switching controls under constraints. We characterize the value function as solution of an HJB equation and provide some numerical approximating methods. We shall illustrate by numerical examples the main achievements of the present approach.
期刊介绍:
ASMBI - Applied Stochastic Models in Business and Industry (formerly Applied Stochastic Models and Data Analysis) was first published in 1985, publishing contributions in the interface between stochastic modelling, data analysis and their applications in business, finance, insurance, management and production. In 2007 ASMBI became the official journal of the International Society for Business and Industrial Statistics (www.isbis.org). The main objective is to publish papers, both technical and practical, presenting new results which solve real-life problems or have great potential in doing so. Mathematical rigour, innovative stochastic modelling and sound applications are the key ingredients of papers to be published, after a very selective review process.
The journal is very open to new ideas, like Data Science and Big Data stemming from problems in business and industry or uncertainty quantification in engineering, as well as more traditional ones, like reliability, quality control, design of experiments, managerial processes, supply chains and inventories, insurance, econometrics, financial modelling (provided the papers are related to real problems). The journal is interested also in papers addressing the effects of business and industrial decisions on the environment, healthcare, social life. State-of-the art computational methods are very welcome as well, when combined with sound applications and innovative models.