Cost Impact Comparative Analysis via BIM between Heritage Regular Maintenance Projects and Long-Term Restoration Projects—A Case Study

IF 2 0 HUMANITIES, MULTIDISCIPLINARY
Heritage Pub Date : 2023-12-20 DOI:10.3390/heritage7010002
Doaa Tahoon, Ayman El-Zohairy, Hesham Ibrahim Hendawy
{"title":"Cost Impact Comparative Analysis via BIM between Heritage Regular Maintenance Projects and Long-Term Restoration Projects—A Case Study","authors":"Doaa Tahoon, Ayman El-Zohairy, Hesham Ibrahim Hendawy","doi":"10.3390/heritage7010002","DOIUrl":null,"url":null,"abstract":"The financial implications of long-term restoration projects for cultural heritage, as compared to regular maintenance efforts, often underscore a flawed decision-making process. This can result from years of neglect versus consistent, organized maintenance. Striking a balance between these strategies is paramount for preserving cultural legacies. This research aims to evaluate the trade-offs between the initial expenditures of restoration initiatives and the consistent costs of maintenance activities. We leverage Building Information Modelling (BIM) and its specialized application for heritage preservation, known as Heritage Building Information Modelling (HBIM). This offers a digital depiction of the heritage building’s conservation state and associated intervention costs. Specifically, this study taps into the fifth dimension of BIM, cost estimation, to draw a comparative analysis between the financial ramifications of regular maintenance and long-term restoration projects. This assessment is exemplified through a case study on the “Aidkeen Al-Bendqdari Dome” located in historic Cairo, Egypt—a component of the Prince Taz Palace. The analysis integrates cost data to generate insights. The ultimate goal is to devise a comparative framework that can guide authorities in budgetary decisions and resource distribution.","PeriodicalId":12934,"journal":{"name":"Heritage","volume":"29 12","pages":""},"PeriodicalIF":2.0000,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Heritage","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/heritage7010002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"HUMANITIES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

The financial implications of long-term restoration projects for cultural heritage, as compared to regular maintenance efforts, often underscore a flawed decision-making process. This can result from years of neglect versus consistent, organized maintenance. Striking a balance between these strategies is paramount for preserving cultural legacies. This research aims to evaluate the trade-offs between the initial expenditures of restoration initiatives and the consistent costs of maintenance activities. We leverage Building Information Modelling (BIM) and its specialized application for heritage preservation, known as Heritage Building Information Modelling (HBIM). This offers a digital depiction of the heritage building’s conservation state and associated intervention costs. Specifically, this study taps into the fifth dimension of BIM, cost estimation, to draw a comparative analysis between the financial ramifications of regular maintenance and long-term restoration projects. This assessment is exemplified through a case study on the “Aidkeen Al-Bendqdari Dome” located in historic Cairo, Egypt—a component of the Prince Taz Palace. The analysis integrates cost data to generate insights. The ultimate goal is to devise a comparative framework that can guide authorities in budgetary decisions and resource distribution.
通过 BIM 对文物定期维护项目和长期修复项目进行成本影响比较分析--案例研究
与定期维护工作相比,文化遗产长期修复项目的财务影响往往凸显出决策过程的缺陷。这可能是由于多年的忽视和持续、有组织的维护造成的。在这些策略之间取得平衡对于保护文化遗产至关重要。本研究旨在评估修复措施的初始支出与维护活动的持续成本之间的权衡。我们利用建筑信息模型(BIM)及其在遗产保护方面的专门应用,即遗产建筑信息模型(HBIM)。这提供了文物建筑保护状态和相关干预成本的数字描述。具体而言,本研究利用 BIM 的第五个维度--成本估算,对定期维护和长期修复项目的财务影响进行比较分析。该评估通过对位于埃及开罗历史古迹中的 "Aidkeen Al-Bendqdari 圆顶"--塔兹王子宫殿的一个组成部分--的案例研究来体现。该分析整合了成本数据,以产生深刻的见解。最终目标是设计出一个比较框架,为当局的预算决策和资源分配提供指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Heritage
Heritage Multiple-
CiteScore
2.90
自引率
17.60%
发文量
165
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信