Technical Assessment and Implementation of Cemented Rock Fill at the Cerro Lindo Mining Unit in Peru

IF 0.7 4区 工程技术 Q4 MINING & MINERAL PROCESSING
L. A. Pérez, C. G. Perea
{"title":"Technical Assessment and Implementation of Cemented Rock Fill at the Cerro Lindo Mining Unit in Peru","authors":"L. A. Pérez, C. G. Perea","doi":"10.1134/s1062739123040087","DOIUrl":null,"url":null,"abstract":"<h3 data-test=\"abstract-sub-heading\">Abstract</h3><p>The authors developed a pilot project to test different preparations of cemented rock fill, determine the appropriate mix design, and check necessary mix strength. The article presents the required resistance studies and the research method used to determine feasibility, cost performance and increased mine productivity and safety. The study achieved a resistance peak of 1.6 MPa, reduced dilution of the ore, and increased pillar stability.</p>","PeriodicalId":16358,"journal":{"name":"Journal of Mining Science","volume":"45 8","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2023-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining Science","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1134/s1062739123040087","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0

Abstract

The authors developed a pilot project to test different preparations of cemented rock fill, determine the appropriate mix design, and check necessary mix strength. The article presents the required resistance studies and the research method used to determine feasibility, cost performance and increased mine productivity and safety. The study achieved a resistance peak of 1.6 MPa, reduced dilution of the ore, and increased pillar stability.

Abstract Image

秘鲁Cerro Lindo矿区胶结岩石充填技术评价与实施
摘要开展了试验研究,对不同的胶结石填料进行了试验,确定了合适的配合比设计,并校核了必要的配合比强度。本文提出了所需的阻力研究和研究方法,以确定可行性,成本效益和提高矿山生产力和安全性。试验取得了1.6 MPa的阻力峰,降低了矿石的贫化,提高了矿柱的稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Mining Science
Journal of Mining Science 工程技术-矿业与矿物加工
CiteScore
1.70
自引率
25.00%
发文量
19
审稿时长
24 months
期刊介绍: The Journal reflects the current trends of development in fundamental and applied mining sciences. It publishes original articles on geomechanics and geoinformation science, investigation of relationships between global geodynamic processes and man-induced disasters, physical and mathematical modeling of rheological and wave processes in multiphase structural geological media, rock failure, analysis and synthesis of mechanisms, automatic machines, and robots, science of mining machines, creation of resource-saving and ecologically safe technologies of mineral mining, mine aerology and mine thermal physics, coal seam degassing, mechanisms for origination of spontaneous fires and methods for their extinction, mineral dressing, and bowel exploitation.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信