Thierry Gastineau, Cynthia Ban, Ana Basso, Franziska Brehme, Ana Luisa Silva, Olivier Faure, Lyne Le Palaire, Priya Persaud, Heraclio Rodriguez
{"title":"Worldwide Regulatory Reliance: Launching a Pilot on a Chemistry, Manufacturing, and Control Post Approval Change for a Vaccine.","authors":"Thierry Gastineau, Cynthia Ban, Ana Basso, Franziska Brehme, Ana Luisa Silva, Olivier Faure, Lyne Le Palaire, Priya Persaud, Heraclio Rodriguez","doi":"10.5731/pdajpst.2023.012850","DOIUrl":null,"url":null,"abstract":"<p><p>When an initial marketing authorization of a pharmaceutical product is granted, a substantial number of chemistry, manufacturing, and control (CMC) post approval changes (PACs) have to be managed by the manufacturers. Despite efforts undertaken over the years by multiple regulatory jurisdictions, there is still heterogeneity in terms of regulatory requirements and timelines across national regulatory authorities (NRAs). This creates complexity in managing global CMC PACs, putting the supply of medical products at risk. Regulators have developed regulatory mechanisms that aim at accelerating the reviews and approvals of PACs by NRAs. The World Health Organization (WHO) is supporting the concept of \"reliance\" among NRAs, which are encouraged to rely on the assessment completed by a \"highly performing authority\". The objective is to accelerate the overall process for PACs, ultimately fostering more equitable and timely access to medical products for populations who need them. With the support of Health Canada, WHO, Pan American Health Organization, and the Paul-Ehrlich-Institut, Sanofi has launched a pilot using the principles of reliance for a CMC PAC for a vaccine, with 21 NRAs who accepted to participate in the pilot. The objective of this pilot was to apply these principles to reduce the approval timeline to a maximum of 6 months in all countries after an initial approval is granted by a reference authority. We discuss the opportunities and challenges of implementing reliance principles for CMC PACs. We also describe the pilot experience by sharing initial lessons learned from the Step 1 of this pilot, which consisted of engaging the reference authority and the NRAs.</p>","PeriodicalId":19986,"journal":{"name":"PDA Journal of Pharmaceutical Science and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-08-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PDA Journal of Pharmaceutical Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5731/pdajpst.2023.012850","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Medicine","Score":null,"Total":0}
引用次数: 0
Abstract
When an initial marketing authorization of a pharmaceutical product is granted, a substantial number of chemistry, manufacturing, and control (CMC) post approval changes (PACs) have to be managed by the manufacturers. Despite efforts undertaken over the years by multiple regulatory jurisdictions, there is still heterogeneity in terms of regulatory requirements and timelines across national regulatory authorities (NRAs). This creates complexity in managing global CMC PACs, putting the supply of medical products at risk. Regulators have developed regulatory mechanisms that aim at accelerating the reviews and approvals of PACs by NRAs. The World Health Organization (WHO) is supporting the concept of "reliance" among NRAs, which are encouraged to rely on the assessment completed by a "highly performing authority". The objective is to accelerate the overall process for PACs, ultimately fostering more equitable and timely access to medical products for populations who need them. With the support of Health Canada, WHO, Pan American Health Organization, and the Paul-Ehrlich-Institut, Sanofi has launched a pilot using the principles of reliance for a CMC PAC for a vaccine, with 21 NRAs who accepted to participate in the pilot. The objective of this pilot was to apply these principles to reduce the approval timeline to a maximum of 6 months in all countries after an initial approval is granted by a reference authority. We discuss the opportunities and challenges of implementing reliance principles for CMC PACs. We also describe the pilot experience by sharing initial lessons learned from the Step 1 of this pilot, which consisted of engaging the reference authority and the NRAs.