Worldwide Regulatory Reliance: Launching a Pilot on a Chemistry, Manufacturing, and Control Post Approval Change for a Vaccine.

Q3 Medicine
Thierry Gastineau, Cynthia Ban, Ana Basso, Franziska Brehme, Ana Luisa Silva, Olivier Faure, Lyne Le Palaire, Priya Persaud, Heraclio Rodriguez
{"title":"Worldwide Regulatory Reliance: Launching a Pilot on a Chemistry, Manufacturing, and Control Post Approval Change for a Vaccine.","authors":"Thierry Gastineau, Cynthia Ban, Ana Basso, Franziska Brehme, Ana Luisa Silva, Olivier Faure, Lyne Le Palaire, Priya Persaud, Heraclio Rodriguez","doi":"10.5731/pdajpst.2023.012850","DOIUrl":null,"url":null,"abstract":"<p><p>When an initial marketing authorization of a pharmaceutical product is granted, a substantial number of chemistry, manufacturing, and control (CMC) post approval changes (PACs) have to be managed by the manufacturers. Despite efforts undertaken over the years by multiple regulatory jurisdictions, there is still heterogeneity in terms of regulatory requirements and timelines across national regulatory authorities (NRAs). This creates complexity in managing global CMC PACs, putting the supply of medical products at risk. Regulators have developed regulatory mechanisms that aim at accelerating the reviews and approvals of PACs by NRAs. The World Health Organization (WHO) is supporting the concept of \"reliance\" among NRAs, which are encouraged to rely on the assessment completed by a \"highly performing authority\". The objective is to accelerate the overall process for PACs, ultimately fostering more equitable and timely access to medical products for populations who need them. With the support of Health Canada, WHO, Pan American Health Organization, and the Paul-Ehrlich-Institut, Sanofi has launched a pilot using the principles of reliance for a CMC PAC for a vaccine, with 21 NRAs who accepted to participate in the pilot. The objective of this pilot was to apply these principles to reduce the approval timeline to a maximum of 6 months in all countries after an initial approval is granted by a reference authority. We discuss the opportunities and challenges of implementing reliance principles for CMC PACs. We also describe the pilot experience by sharing initial lessons learned from the Step 1 of this pilot, which consisted of engaging the reference authority and the NRAs.</p>","PeriodicalId":19986,"journal":{"name":"PDA Journal of Pharmaceutical Science and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-08-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PDA Journal of Pharmaceutical Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5731/pdajpst.2023.012850","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Medicine","Score":null,"Total":0}
引用次数: 0

Abstract

When an initial marketing authorization of a pharmaceutical product is granted, a substantial number of chemistry, manufacturing, and control (CMC) post approval changes (PACs) have to be managed by the manufacturers. Despite efforts undertaken over the years by multiple regulatory jurisdictions, there is still heterogeneity in terms of regulatory requirements and timelines across national regulatory authorities (NRAs). This creates complexity in managing global CMC PACs, putting the supply of medical products at risk. Regulators have developed regulatory mechanisms that aim at accelerating the reviews and approvals of PACs by NRAs. The World Health Organization (WHO) is supporting the concept of "reliance" among NRAs, which are encouraged to rely on the assessment completed by a "highly performing authority". The objective is to accelerate the overall process for PACs, ultimately fostering more equitable and timely access to medical products for populations who need them. With the support of Health Canada, WHO, Pan American Health Organization, and the Paul-Ehrlich-Institut, Sanofi has launched a pilot using the principles of reliance for a CMC PAC for a vaccine, with 21 NRAs who accepted to participate in the pilot. The objective of this pilot was to apply these principles to reduce the approval timeline to a maximum of 6 months in all countries after an initial approval is granted by a reference authority. We discuss the opportunities and challenges of implementing reliance principles for CMC PACs. We also describe the pilot experience by sharing initial lessons learned from the Step 1 of this pilot, which consisted of engaging the reference authority and the NRAs.

全球监管依赖:启动A疫苗化学、制造和控制审批变更试点。
当药品的初始上市许可被授予时,制造商必须管理大量的化学、制造和控制(CMC)批准后变更(pac)。尽管多个监管管辖区多年来做出了努力,但各国监管机构(nra)在监管要求和时间表方面仍然存在差异。这增加了管理全球CMC pac的复杂性,使医疗产品的供应面临风险。监管机构已经制定了监管机制,旨在加快国家监管机构对pac的审查和批准。世界卫生组织(世卫组织)正在支持国家评估机构之间的"依赖"概念,鼓励它们依赖一个″高绩效机构″完成的评估。其目标是加快药品供应计划的总体进程,最终促进有需要的人群更公平和及时地获得医疗产品。在加拿大卫生部、世卫组织、泛美卫生组织和保罗-埃利希研究所的支持下,赛诺菲启动了一个试点项目,利用CMC疫苗评估委员会的依赖原则,有21个国家认可机构接受参与该试点项目。该试点的目标是应用这些原则,在参考当局给予初步批准后,在所有国家将批准时间缩短到最多6个月。我们讨论了CMC pac实施依赖原则的机遇和挑战。我们还描述了试点经验,通过分享从该试点的第1步获得的初步经验教训,其中包括与参考权威机构和nra的接触。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.90
自引率
0.00%
发文量
34
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信