Carbon and Energy Life Cycle Analysis of Wind Energy Industry in Libya

Suhaylah Mohammed Mohammed, Yasser Nassar, Wedad El-Osta, Hala J. El-Khozondar, Abdulhakeem Miskeen, Ali Basha
{"title":"Carbon and Energy Life Cycle Analysis of Wind Energy Industry in Libya","authors":"Suhaylah Mohammed Mohammed, Yasser Nassar, Wedad El-Osta, Hala J. El-Khozondar, Abdulhakeem Miskeen, Ali Basha","doi":"10.51646/jsesd.v12i1.150","DOIUrl":null,"url":null,"abstract":"By analyzing a wide range of energy, economic, and environmental variables for a variety of attractive locations in Libya, the study established the fundamentals of localizing the wind energy business in Libya. The estimate of the greenhouse gas (GHG) emission factor resulting from the conversion of wind energy into electric energy also includes the quantity of GHG emissions from cement manufacturing and transportation, as well as manufacturing (for various wind turbine manufacturers), sea transportation of wind energy equipment from the site of manufacture to the port of Tripoli, land transportation to the location of the wind energy farm, and calculating the energy and emissions used for recycling recyclable materials and for transportation. Hourly climate data over a 25-year period (1995-2020) were gathered from the SolarGis climate information portal. For many viable wind energy production locations in Libya, the System Advisor Model (SAM) software was used to calculate the productivity of wind farms with a 100 MW capacity. The study's findings showed that the Gamesa turbine, whose capital cost was around (146,916,400 dollars), had the best economic and environmental indices. The GHG emission rates for all the cities that were targeted ranged from 24-63g GHG/kWh. The time needed for carbon to recover ranged from 5.5 to 14.5 months. The expected energy payback time was 14 to 22 months. An LCOE's production costs ranged from 4.8 to 11.1 cents per kWh.","PeriodicalId":32951,"journal":{"name":"Solar Energy and Sustainable Development","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Solar Energy and Sustainable Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51646/jsesd.v12i1.150","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

By analyzing a wide range of energy, economic, and environmental variables for a variety of attractive locations in Libya, the study established the fundamentals of localizing the wind energy business in Libya. The estimate of the greenhouse gas (GHG) emission factor resulting from the conversion of wind energy into electric energy also includes the quantity of GHG emissions from cement manufacturing and transportation, as well as manufacturing (for various wind turbine manufacturers), sea transportation of wind energy equipment from the site of manufacture to the port of Tripoli, land transportation to the location of the wind energy farm, and calculating the energy and emissions used for recycling recyclable materials and for transportation. Hourly climate data over a 25-year period (1995-2020) were gathered from the SolarGis climate information portal. For many viable wind energy production locations in Libya, the System Advisor Model (SAM) software was used to calculate the productivity of wind farms with a 100 MW capacity. The study's findings showed that the Gamesa turbine, whose capital cost was around (146,916,400 dollars), had the best economic and environmental indices. The GHG emission rates for all the cities that were targeted ranged from 24-63g GHG/kWh. The time needed for carbon to recover ranged from 5.5 to 14.5 months. The expected energy payback time was 14 to 22 months. An LCOE's production costs ranged from 4.8 to 11.1 cents per kWh.
利比亚风能产业碳和能源生命周期分析
通过分析利比亚各种有吸引力的地点的广泛的能源、经济和环境变量,该研究建立了利比亚风能业务本地化的基础。对风能转化为电能所产生的温室气体(GHG)排放因子的估计还包括水泥制造和运输,以及制造(对于各种风力涡轮机制造商),风能设备从制造地点到的黎波里港口的海上运输,到风力发电场所在地的陆路运输,并计算用于回收可回收材料和运输的能源和排放。从SolarGis气候信息门户网站收集了25年(1995-2020年)的每小时气候数据。对于利比亚许多可行的风能生产地点,使用系统顾问模型(SAM)软件来计算100兆瓦容量的风力发电场的生产力。研究结果显示,投资成本约为14万691.64万美元的Gamesa涡轮机具有最佳的经济和环境指标。所有目标城市的温室气体排放量在24-63克温室气体/千瓦时之间。碳恢复所需的时间从5.5到14.5个月不等。预期能源回收期为14至22个月。LCOE的生产成本从每千瓦时4.8到11.1美分不等。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.90
自引率
0.00%
发文量
0
审稿时长
20 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信