Cause of delay and cost overrun in infrastructure projects

Salam Mahmood Hamad
{"title":"Cause of delay and cost overrun in infrastructure projects","authors":"Salam Mahmood Hamad","doi":"10.58934/jgeb.v4i15.201","DOIUrl":null,"url":null,"abstract":"This paper focused on identifies causes of cost overrun and delay factors in infrastructure projects. Mainly, a structured review of literature has been conducted for the purpose of knowing extend of time delay and cost overruns experienced by infrastructure projects. To know this issue this paper explored current state of cost overruns and delay in infrastructural projects. Principally, the reviewed of 15 empirical literatures demonstrated different causes of delay and cost overrun. Main findings proposed distinctive factors of cost overrun and delays, and the main of them; pitfalls and errors in design, economic and political instability, bureaucracy of owner, poor experience of contractors, late in payment to contractor for terminate work, incompetent contractor human resources, in accurate scheduling and initial cost estimation by contractor and recurrent design change.","PeriodicalId":32548,"journal":{"name":"Global Journal of Economics and Business","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Journal of Economics and Business","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58934/jgeb.v4i15.201","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper focused on identifies causes of cost overrun and delay factors in infrastructure projects. Mainly, a structured review of literature has been conducted for the purpose of knowing extend of time delay and cost overruns experienced by infrastructure projects. To know this issue this paper explored current state of cost overruns and delay in infrastructural projects. Principally, the reviewed of 15 empirical literatures demonstrated different causes of delay and cost overrun. Main findings proposed distinctive factors of cost overrun and delays, and the main of them; pitfalls and errors in design, economic and political instability, bureaucracy of owner, poor experience of contractors, late in payment to contractor for terminate work, incompetent contractor human resources, in accurate scheduling and initial cost estimation by contractor and recurrent design change.
导致基础设施项目延误和成本超支的原因
本文重点研究了基础设施项目中成本超支和延迟因素的成因。主要是为了了解基础设施项目所经历的时间延迟和成本超支的范围,对文献进行了结构化的回顾。为了了解这一问题,本文探讨了基础设施项目成本超支和延误的现状。主要通过对15篇实证文献的回顾,揭示了延误和成本超支的不同原因。主要发现提出了不同的成本超支和延误因素,其中的主要因素;设计中的陷阱和错误,经济和政治的不稳定,业主的官僚作风,承包商的经验不足,承包商终止工程的付款延迟,承包商的人力资源不称职,承包商的准确调度和初始成本估算以及反复的设计变更。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
48
审稿时长
6 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信