Assessing Delay Factors and Mitigation Measures in Building Maintenance Works

IF 0.6 Q4 CONSTRUCTION & BUILDING TECHNOLOGY
Mohd Norazam Yasin, Ruzaimah Razman, Sasitharan Nagapan, Farzaneh Moayedi
{"title":"Assessing Delay Factors and Mitigation Measures in Building Maintenance Works","authors":"Mohd Norazam Yasin, Ruzaimah Razman, Sasitharan Nagapan, Farzaneh Moayedi","doi":"10.30880/ijscet.2023.14.03.011","DOIUrl":null,"url":null,"abstract":"When it comes to the operation of a construction industry, building maintenance is critical. Any structure must be well-maintained to prevent minor problems from becoming major ones. Delayed building maintenance may result in increased repair costs as well as a reduction in building lifespan. To avoid this problem, research has been conducted to identify the factors that cause building maintenance delays and mitigation measures to resolve building maintenance delays. To achieve the study's objectives, extensive literature research and a questionnaire survey were conducted. Based on previous literature research, accumulated data was used to create a questionnaire for 250 Malaysian building maintenance delay factors and mitigation measures. A group of professionals and experts, including top management, project managers, engineers, architects, assistant engineers, technicians, human resources and administration, and others, participated in this survey. SPSS statistical software was used to analyse the collected data using the average mean index method and correlation. According to the data, the three highest mean index values from the factors that cause maintenance work delays are an increase in maintenance costs as the building age increases, an incorrect timing for work can incur higher maintenance costs when a critical job item is overlooked, and improper planning and budgeting. For correlation analysis, it was found that the correlations amongst the five groups of delay factors are having strong relationship with Pearson correlation value of 0.5. While for mitigation measures of the delay, it was found that three highest ranks are prefer other organizational structure follows by policy and objective and good communication. The findings can assist construction practitioners in prioritising their maintenance works.","PeriodicalId":14418,"journal":{"name":"International Journal of Sustainable Construction Engineering and Technology","volume":"76 1","pages":"0"},"PeriodicalIF":0.6000,"publicationDate":"2023-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Sustainable Construction Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30880/ijscet.2023.14.03.011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

When it comes to the operation of a construction industry, building maintenance is critical. Any structure must be well-maintained to prevent minor problems from becoming major ones. Delayed building maintenance may result in increased repair costs as well as a reduction in building lifespan. To avoid this problem, research has been conducted to identify the factors that cause building maintenance delays and mitigation measures to resolve building maintenance delays. To achieve the study's objectives, extensive literature research and a questionnaire survey were conducted. Based on previous literature research, accumulated data was used to create a questionnaire for 250 Malaysian building maintenance delay factors and mitigation measures. A group of professionals and experts, including top management, project managers, engineers, architects, assistant engineers, technicians, human resources and administration, and others, participated in this survey. SPSS statistical software was used to analyse the collected data using the average mean index method and correlation. According to the data, the three highest mean index values from the factors that cause maintenance work delays are an increase in maintenance costs as the building age increases, an incorrect timing for work can incur higher maintenance costs when a critical job item is overlooked, and improper planning and budgeting. For correlation analysis, it was found that the correlations amongst the five groups of delay factors are having strong relationship with Pearson correlation value of 0.5. While for mitigation measures of the delay, it was found that three highest ranks are prefer other organizational structure follows by policy and objective and good communication. The findings can assist construction practitioners in prioritising their maintenance works.
评估楼宇维修工程的延误因素及缓解措施
当涉及到一个建筑行业的运作,建筑维护是至关重要的。任何结构都必须维护好,防止小问题变成大问题。延迟建筑物维修可能导致维修成本增加以及建筑物寿命缩短。为了避免这个问题,我们进行了研究,以确定导致建筑物维修延误的因素和缓解措施,以解决建筑物维修延误。为了达到研究的目的,我们进行了广泛的文献研究和问卷调查。在先前文献研究的基础上,利用积累的数据为250个马来西亚建筑维修延误因素和缓解措施创建了一份问卷。一群专业人士和专家,包括高层管理人员、项目经理、工程师、建筑师、助理工程师、技术人员、人力资源和行政人员等,参与了这项调查。采用SPSS统计软件对收集的数据进行平均指数法和相关性分析。根据数据,导致维修工作延误的三个最高平均指数值因素是:随着建筑物年龄的增加,维修成本增加;当一个关键的工作项目被忽视时,错误的工作时间可能会导致更高的维修成本;通过相关分析发现,五组延迟因素之间的相关性都很强,Pearson相关值为0.5。而对于延迟的缓解措施,发现三个最高级别更倾向于其他组织结构,其次是政策和目标以及良好的沟通。研究结果可协助建造业从业员安排维修工程的优先次序。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.90
自引率
20.00%
发文量
25
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信