Influence of Knowledge Acquisition Practices on the Performance of County Development Projects in Meru County Government

Beatrice Karwirwa Mukiira, Robert Obuba
{"title":"Influence of Knowledge Acquisition Practices on the Performance of County Development Projects in Meru County Government","authors":"Beatrice Karwirwa Mukiira, Robert Obuba","doi":"10.9734/ajeba/2023/v23i221140","DOIUrl":null,"url":null,"abstract":"Public infrastructure projects have progressed at a moderate rate since independence. The information provided by the Kenyan government in 2014 regarding their vision for 2030, aiming to make Kenya an internationally competitive and prosperous nation, shows that the slow progress in implementing public infrastructure projects has resulted in inadequate road networks, underdeveloped public facilities, a lack of connectivity between rural areas and industrial hubs, insufficient measures to mitigate challenges in agricultural regions, and a decline in formerly thriving industries. County governments face a significant challenge in effectively utilizing knowledge management within project management to maximize their outcomes. This research aimed to ascertain whether knowledge acquisition practices influences performance of county development projects in Meru County Government. The research was conducted in a descriptive manner. It targeted a total of 139 respondents from nine Sub-counties in Meru County, including members of county assemblies (MCAs), sub-county departmental heads, project management committee members, and county chief officers. A sample of 103 individuals was selected from the population to participate in the survey. Structured questionnaires were used as the primary research tool to collect data from the population. The responses were coded and categorized accordingly. The data collected was inputted into SPSS 27.0 and MS Excel for further computational analysis. The study revealed a strong correlation coefficient, with an R value of 0.897, indicating a high level of correlation between the variables. The adjusted R-squared value, which was 0.801, suggested that variations in county development projects were significantly influenced by the independent variable. The study's findings suggest that knowledge acquisition had a positive impact on the performance of the county development projects in Meru County. To enhance this positive influence, the study recommends that the public service engage with technical experts in specific fields for knowledge creation, emphasize the value of employees, organize formal training sessions for new knowledge creation, plan seminars for knowledge sharing, and ensure that staff members are trained in diverse tasks to facilitate information exchange. Furthermore, it is recommended that training programs encompass a wide range of tasks and duties to promote knowledge sharing among staff.","PeriodicalId":433532,"journal":{"name":"Asian Journal of Economics, Business and Accounting","volume":"85 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Journal of Economics, Business and Accounting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9734/ajeba/2023/v23i221140","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Public infrastructure projects have progressed at a moderate rate since independence. The information provided by the Kenyan government in 2014 regarding their vision for 2030, aiming to make Kenya an internationally competitive and prosperous nation, shows that the slow progress in implementing public infrastructure projects has resulted in inadequate road networks, underdeveloped public facilities, a lack of connectivity between rural areas and industrial hubs, insufficient measures to mitigate challenges in agricultural regions, and a decline in formerly thriving industries. County governments face a significant challenge in effectively utilizing knowledge management within project management to maximize their outcomes. This research aimed to ascertain whether knowledge acquisition practices influences performance of county development projects in Meru County Government. The research was conducted in a descriptive manner. It targeted a total of 139 respondents from nine Sub-counties in Meru County, including members of county assemblies (MCAs), sub-county departmental heads, project management committee members, and county chief officers. A sample of 103 individuals was selected from the population to participate in the survey. Structured questionnaires were used as the primary research tool to collect data from the population. The responses were coded and categorized accordingly. The data collected was inputted into SPSS 27.0 and MS Excel for further computational analysis. The study revealed a strong correlation coefficient, with an R value of 0.897, indicating a high level of correlation between the variables. The adjusted R-squared value, which was 0.801, suggested that variations in county development projects were significantly influenced by the independent variable. The study's findings suggest that knowledge acquisition had a positive impact on the performance of the county development projects in Meru County. To enhance this positive influence, the study recommends that the public service engage with technical experts in specific fields for knowledge creation, emphasize the value of employees, organize formal training sessions for new knowledge creation, plan seminars for knowledge sharing, and ensure that staff members are trained in diverse tasks to facilitate information exchange. Furthermore, it is recommended that training programs encompass a wide range of tasks and duties to promote knowledge sharing among staff.
知识获取实践对Meru县政府县域发展项目绩效的影响
自独立以来,公共基础设施项目以适度的速度发展。肯尼亚政府在2014年提供的关于其2030年愿景的信息,旨在使肯尼亚成为一个具有国际竞争力和繁荣的国家,表明在实施公共基础设施项目方面进展缓慢,导致道路网络不足,公共设施不发达,农村地区和工业中心之间缺乏连通性,缓解农业地区挑战的措施不足,以及以前繁荣的工业下降。县政府在有效利用项目管理中的知识管理以最大化其成果方面面临着重大挑战。摘要本研究旨在探讨知识获取实务是否会影响梅鲁县政府的县域发展专案绩效。这项研究是以描述性的方式进行的。该调查的对象是来自梅鲁县9个副县的139名受访者,包括县议会成员、副县部门负责人、项目管理委员会成员和县长。从人群中选出103个人参加调查。结构性调查问卷被用作主要的研究工具,从人群中收集数据。对回答进行了相应的编码和分类。将采集到的数据分别输入SPSS 27.0和MS Excel进行计算分析。研究发现,相关系数较强,R值为0.897,表明变量之间具有较高的相关性。调整后的r平方值为0.801,说明县域发展项目的变化受到自变量的显著影响。研究结果表明,知识获取对Meru县县域发展项目绩效具有正向影响。为了加强这一积极影响,该研究建议公共服务部门与特定领域的技术专家接触,以创造知识,强调雇员的价值,组织正式的培训课程,以创造新知识,计划知识共享研讨会,并确保工作人员接受各种任务的培训,以促进信息交流。此外,建议培训方案包括广泛的任务和职责,以促进工作人员之间的知识分享。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信