{"title":"A two-stage capacity reservation contract model with backup sourcing considering supply side disruptions","authors":"Sidharath Joshi, Huynh Trung Luong","doi":"10.1080/21681015.2023.2264288","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":16024,"journal":{"name":"Journal of Industrial and Production Engineering","volume":"233 3","pages":"0"},"PeriodicalIF":4.0000,"publicationDate":"2023-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Industrial and Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/21681015.2023.2264288","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}