{"title":"Influence of Construction Period of Bridge Across Reservoir on Operation of Adjacent Power Station","authors":"Xi Mao, Hongyu Qiu, Rui Wang, Peiyu Huang, Shuiqian Wang, Nengzhong Lei, Weimin Wu, Songliang Chen, Lele Wang, Jiawen Huang, Zhongquan Xu","doi":"10.14311/cej.2023.03.0026","DOIUrl":null,"url":null,"abstract":"The influence of the construction period of the bridge project across the reservoir on the adjacent power station includes not only the direct impact on the hydropower hub but also the impacts on the reservoir area, flood discharge, power station head, water diversion and sediment prevention, power generation operation, and other factors. In this paper, from the aspects of the power station operation, an evaluation index for the influence of the construction period of a bridge across a reservoir on the adjacent power station is developed, and an evaluation system is constructed. Based on the constructed evaluation system, the influence of the bridge construction period on the adjacent power stations is analyzed. This evaluation system provides a reference for the impact assessment of cross-reservoir bridge engineering on adjacent hydropower stations.","PeriodicalId":42993,"journal":{"name":"Civil Engineering Journal-Stavebni Obzor","volume":"17 1","pages":"0"},"PeriodicalIF":0.3000,"publicationDate":"2023-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Journal-Stavebni Obzor","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14311/cej.2023.03.0026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
Abstract
The influence of the construction period of the bridge project across the reservoir on the adjacent power station includes not only the direct impact on the hydropower hub but also the impacts on the reservoir area, flood discharge, power station head, water diversion and sediment prevention, power generation operation, and other factors. In this paper, from the aspects of the power station operation, an evaluation index for the influence of the construction period of a bridge across a reservoir on the adjacent power station is developed, and an evaluation system is constructed. Based on the constructed evaluation system, the influence of the bridge construction period on the adjacent power stations is analyzed. This evaluation system provides a reference for the impact assessment of cross-reservoir bridge engineering on adjacent hydropower stations.
期刊介绍:
The Civil Engineering Journal’s objective is to present the latest progress in research and development in civil engineering. It is desired to provide free and up to date information regarding innovations in various civil engineering fields. The Civil Engineering Journal is opened for all authors worldwide that follow the journal‘s requirements (theme, template and affirmative reviews). The journal is administrated by a public university (Civil Engineering faculty, Czech Technical University in Prague) and therefore publishing is free of charge with no exceptions. Main journal themes correspond to specialization of the Civil Engineering Faculty, CTU in Prague. Namely: Applied informatics Architecture Building Constructions and Municipal Engineering Building structures Building materials and components Building physics, building services Construction technology Construction management and economics Geodesy, Cartography, GIS Geotechnics Hydraulics and hydrology Hydraulic structures Indoor environmental and building services engineering Landscape water conservation Road and railway structures Sanitary and ecological engineering Structural mechanics Urban facility management Urban design, Town and regional planning Water management, Water structures.