Assessment of Relationship between Project Consultants and the Performance of Construction Projects: A Case of Rwanda Urban Development Project I

{"title":"Assessment of Relationship between Project Consultants and the Performance of Construction Projects: A Case of Rwanda Urban Development Project I","authors":"","doi":"10.53819/81018102t2206","DOIUrl":null,"url":null,"abstract":"In several of Rwanda's key industries, including construction, there is a chronic lack of qualified project consultants. In most cases, the owner of a building project places his trust in the words of the contract agreements between himself and the builders or project contractors. The general objective of this research assessed the relationship between project consultants and performance of construction projects in Rwanda. This study had the following specific objectives: to find out the relationship between cost management consultancy and performance of Rwanda Urban Development Project I, examine the relationship between scope management consultancy and performance of Rwanda Urban Development Project I, determine the relationship between risk management consultancy and performance of Rwanda Urban Development Project I and analyze the relationship between stakeholders participation consultancy and performance of Rwanda Urban Development Project I. The survey design collected data via the use of questionnaires, while the correlational approach investigates the connection between the variables under consideration analyzed quantitatively and qualitatively. Target population of this study was 138 staff of Rwanda Urban Development Project in City of Kigali, Huye, Muhanga, Musanze, Nyagatare, Rubavu, Nyagatare and Rusizi District. Sample size was determined by the help of Solvin’s formula. For this study, 103 Questionnaires used to collect quantitative and qualitative data related on Rwanda Urban Development Project I. To analyze the data gathered, the researcher used Statistical Package for Social Sciences (SPSS) statistical methodology.  The correlation coefficient (R) of 0.858 indicates a strong positive relationship between the combined consultancy factors (Stakeholders Participation, Scope Management, Risk Management, and Cost Management) and project performance. The coefficient of determination (R squared) at 0.736 suggests that approximately 73.6% of the variability in project performance can be explained by the variation in these combined consultancy factors. This highlights the significant influence of these consultancies on enhancing project outcomes. To enhance the relationship between cost management consultancy and project performance in Rwanda Urban Development Project I, it is recommended to implement robust cost estimation techniques, regularly monitor budget variances, and employ advanced cost forecasting models. Keywords: Project Consultants, Cost Management, Scope Management, Risk Management, Stakeholders Participation and Project Performance","PeriodicalId":480774,"journal":{"name":"Journal of entrepreneurship & project management","volume":"941 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of entrepreneurship & project management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t2206","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In several of Rwanda's key industries, including construction, there is a chronic lack of qualified project consultants. In most cases, the owner of a building project places his trust in the words of the contract agreements between himself and the builders or project contractors. The general objective of this research assessed the relationship between project consultants and performance of construction projects in Rwanda. This study had the following specific objectives: to find out the relationship between cost management consultancy and performance of Rwanda Urban Development Project I, examine the relationship between scope management consultancy and performance of Rwanda Urban Development Project I, determine the relationship between risk management consultancy and performance of Rwanda Urban Development Project I and analyze the relationship between stakeholders participation consultancy and performance of Rwanda Urban Development Project I. The survey design collected data via the use of questionnaires, while the correlational approach investigates the connection between the variables under consideration analyzed quantitatively and qualitatively. Target population of this study was 138 staff of Rwanda Urban Development Project in City of Kigali, Huye, Muhanga, Musanze, Nyagatare, Rubavu, Nyagatare and Rusizi District. Sample size was determined by the help of Solvin’s formula. For this study, 103 Questionnaires used to collect quantitative and qualitative data related on Rwanda Urban Development Project I. To analyze the data gathered, the researcher used Statistical Package for Social Sciences (SPSS) statistical methodology.  The correlation coefficient (R) of 0.858 indicates a strong positive relationship between the combined consultancy factors (Stakeholders Participation, Scope Management, Risk Management, and Cost Management) and project performance. The coefficient of determination (R squared) at 0.736 suggests that approximately 73.6% of the variability in project performance can be explained by the variation in these combined consultancy factors. This highlights the significant influence of these consultancies on enhancing project outcomes. To enhance the relationship between cost management consultancy and project performance in Rwanda Urban Development Project I, it is recommended to implement robust cost estimation techniques, regularly monitor budget variances, and employ advanced cost forecasting models. Keywords: Project Consultants, Cost Management, Scope Management, Risk Management, Stakeholders Participation and Project Performance
项目顾问与建设项目绩效关系评价——以卢旺达城市发展项目为例1
在卢旺达的几个主要行业,包括建筑业,长期缺乏合格的项目顾问。在大多数情况下,建筑项目的业主信任他与建筑商或工程承包商之间的合同协议中的文字。本研究的总目标是评估卢旺达项目顾问与建筑项目绩效之间的关系。本研究有以下具体目标:找出成本管理咨询与卢旺达城市发展项目I绩效之间的关系,考察卢旺达城市发展项目I范围管理咨询与绩效之间的关系;确定风险管理咨询与卢旺达城市发展项目I绩效之间的关系,分析利益相关者参与咨询与卢旺达城市发展项目I绩效之间的关系。调查设计通过问卷调查的方式收集数据,而相关法调查所考虑的变量之间的联系,定量和定性分析。本研究的目标人群为基加利市、胡耶、穆汉加、穆桑泽、尼亚加塔雷、鲁巴武、尼亚加塔雷和鲁西齐区卢旺达城市发展项目的138名工作人员。样本量由索尔文公式决定。在本研究中,使用了103份问卷来收集与卢旺达城市发展项目i相关的定量和定性数据。为了分析收集到的数据,研究者使用了社会科学统计软件包(SPSS)统计方法。相关系数(R)为0.858,表明综合咨询因素(利益相关者参与、范围管理、风险管理和成本管理)与项目绩效之间存在很强的正相关关系。决定系数(R平方)为0.736,表明大约73.6%的项目绩效可变性可以通过这些组合咨询因素的变化来解释。这突出了这些咨询公司对提高项目成果的重大影响。为了加强卢旺达城市发展项目一的成本管理咨询和项目绩效之间的关系,建议采用可靠的成本估计技术,定期监测预算差异,并采用先进的成本预测模型。关键词:项目顾问,成本管理,范围管理,风险管理,利益相关者参与和项目绩效
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信