Stakeholder Participation and Performance of Water Projects in Kirinyaga County, Kenya

Mercy Wanjiku Mutu
{"title":"Stakeholder Participation and Performance of Water Projects in Kirinyaga County, Kenya","authors":"Mercy Wanjiku Mutu","doi":"10.53819/81018102t4213","DOIUrl":null,"url":null,"abstract":"Performance of a water project largely depend on how stakeholders are involved in the project. Stakeholder participation collaborate all inputs which are important in the project implementation especially providing solutions to various challenges based on their shared experiences. The aim of this research was to investigate the influence of stakeholder participation on performance of water projects in Kirinyaga County, Kenya. The study targeted to evaluate role of involving stakeholder in identification, planning, monitoring and evaluation and implementation on performance of projects pertaining water on county of Kirinyaga. General system hypothesis was used together in conjunction with descriptive research design and cross-sectional in the process of data collection. The total target population were 29 water projects in Kirinyaga County, Kenya. The researcher purposively picked 3 respondents that include managers, assistant project managers and project supervisors giving a total purposive sample of 87 respondents. The questionnaire was used in collecting primary data. Questionnaire were distributed by drop and pick strategy. Analysis of data employed various forms statistics ranging from regression, correlation, standard deviation, mean, percentages and frequencies. The descriptive finding of the study indicated enjoining stakeholders on process of planning, identification, and execution during implementation and supervisory of monitoring and evaluation of projects have been moderately adopted in water projects. Inferential finding indicated that collaborating stakeholders’ initiatives in these following stage of planning, identification, monitoring and evaluation, planning and implementation significantly contributed to performance. The study recommend that proper feasibility study should involve all the stakeholders comprehensively. In addition, adequate sensitization is supposed to be undertaken to equip the community with information that is necessary. The project implementers should involve the community in tracking projects progress. There is need for project and community to work together during assessment so that elaborate assessment is undertaken and all gaps that might hamper project implementation are identified. The study recommends strengthening of public participation in all processes of a project. Public participation promotes accountability in the process thus improving efficiency. Keywords: Stakeholder engagement, project planning, project implementation, KIRIWASCO","PeriodicalId":480774,"journal":{"name":"Journal of entrepreneurship & project management","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of entrepreneurship & project management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t4213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Performance of a water project largely depend on how stakeholders are involved in the project. Stakeholder participation collaborate all inputs which are important in the project implementation especially providing solutions to various challenges based on their shared experiences. The aim of this research was to investigate the influence of stakeholder participation on performance of water projects in Kirinyaga County, Kenya. The study targeted to evaluate role of involving stakeholder in identification, planning, monitoring and evaluation and implementation on performance of projects pertaining water on county of Kirinyaga. General system hypothesis was used together in conjunction with descriptive research design and cross-sectional in the process of data collection. The total target population were 29 water projects in Kirinyaga County, Kenya. The researcher purposively picked 3 respondents that include managers, assistant project managers and project supervisors giving a total purposive sample of 87 respondents. The questionnaire was used in collecting primary data. Questionnaire were distributed by drop and pick strategy. Analysis of data employed various forms statistics ranging from regression, correlation, standard deviation, mean, percentages and frequencies. The descriptive finding of the study indicated enjoining stakeholders on process of planning, identification, and execution during implementation and supervisory of monitoring and evaluation of projects have been moderately adopted in water projects. Inferential finding indicated that collaborating stakeholders’ initiatives in these following stage of planning, identification, monitoring and evaluation, planning and implementation significantly contributed to performance. The study recommend that proper feasibility study should involve all the stakeholders comprehensively. In addition, adequate sensitization is supposed to be undertaken to equip the community with information that is necessary. The project implementers should involve the community in tracking projects progress. There is need for project and community to work together during assessment so that elaborate assessment is undertaken and all gaps that might hamper project implementation are identified. The study recommends strengthening of public participation in all processes of a project. Public participation promotes accountability in the process thus improving efficiency. Keywords: Stakeholder engagement, project planning, project implementation, KIRIWASCO
肯尼亚Kirinyaga县水项目的利益相关者参与与绩效
水项目的绩效在很大程度上取决于利益相关者如何参与项目。利益相关者的参与协作了项目实施中所有重要的投入,特别是根据他们共同的经验为各种挑战提供解决方案。本研究的目的是调查利益相关者参与对肯尼亚Kirinyaga县水项目绩效的影响。本研究旨在评估利益相关者在确定、规划、监测、评估和实施基里尼亚加县水相关项目绩效方面的作用。在数据收集过程中,采用一般系统假设,并结合描述性研究设计和横断面法。总目标人群为肯尼亚Kirinyaga县的29个水项目。研究人员有目的地选择了3名受访者,包括经理、项目助理经理和项目主管,总共有87名受访者。采用问卷调查法收集原始数据。问卷采用丢取策略分发。数据分析采用各种统计形式,包括回归、相关、标准差、平均值、百分比和频率。研究的描述性发现表明,在实施过程中对利益相关者的规划、识别和执行过程以及对项目监测和评估的监督已适度采用。推论结果表明,在接下来的规划、识别、监测和评估、规划和实施阶段,合作的利益相关者的举措对绩效有显著贡献。研究建议,适当的可行性研究应全面涉及所有利益相关者。此外,应该进行充分的宣传,使社区掌握必要的信息。项目实施者应该让社区参与跟踪项目进展。在评估期间,项目和社区需要共同努力,以便进行详细的评估,并查明可能妨碍项目执行的所有差距。该研究建议加强公众对项目所有过程的参与。公众参与促进了过程中的问责制,从而提高了效率。关键词:利益相关者参与,项目规划,项目实施,KIRIWASCO
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信