{"title":"HIRADC Analysis for Rolling Stock Body Lifting Ngrombo Railway Maintenance Center","authors":"Wawan Riyanta","doi":"10.35134/jcivil.v8i2.59","DOIUrl":null,"url":null,"abstract":"The Railway Maintenance Center as stated in the Regulation has the duty and function of carrying out the maintenance of state-owned railway facilities. The part of rolling stock heavy maintenance with high potential hazard is Lifting Body Activities Using OHTC in Maintenance of Hydraulic Diesel Locomotive Facilities activity. it so there is a need for a risk assessment which is a process to determine control priorities for the level of risk work accident or occupational disease. Part of OHSAS 18001:2007 Clouse 4.3.1. recommendation HIRADC methode for can support a safety system with 3 stage analisys (hazard identification, risk assessment, and control determination) The Hazard Identification results obtained 3 aspects of hazard risk in OHTC Rolling stock Body Lifting operations with the following analysis results Crane toppling, Equipment failure, Load falling with Death & asset / property damage impact factor. Risk Assessment analisys of Rolling stock Body Lifting using OHTC obtained results action taken when resources are available regarding handling which in general were Administrative Control. Determine Control relevant steps to minimize potential hazards immediately (1) Evaluating SOP Rolling stock Body Lifting and conduct outreach to all employees related to the work, (2) Making and or adding hazard signs and (3) Human development by conducting Training/Refreshment Crane Operator and Signal man. (4) Strictness of the rules for using PPE for all employees related to the work as the last step in minimizing the risk of occupational hazards.","PeriodicalId":488565,"journal":{"name":"Civil Engineering Collaboration","volume":"34 5","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Collaboration","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35134/jcivil.v8i2.59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Railway Maintenance Center as stated in the Regulation has the duty and function of carrying out the maintenance of state-owned railway facilities. The part of rolling stock heavy maintenance with high potential hazard is Lifting Body Activities Using OHTC in Maintenance of Hydraulic Diesel Locomotive Facilities activity. it so there is a need for a risk assessment which is a process to determine control priorities for the level of risk work accident or occupational disease. Part of OHSAS 18001:2007 Clouse 4.3.1. recommendation HIRADC methode for can support a safety system with 3 stage analisys (hazard identification, risk assessment, and control determination) The Hazard Identification results obtained 3 aspects of hazard risk in OHTC Rolling stock Body Lifting operations with the following analysis results Crane toppling, Equipment failure, Load falling with Death & asset / property damage impact factor. Risk Assessment analisys of Rolling stock Body Lifting using OHTC obtained results action taken when resources are available regarding handling which in general were Administrative Control. Determine Control relevant steps to minimize potential hazards immediately (1) Evaluating SOP Rolling stock Body Lifting and conduct outreach to all employees related to the work, (2) Making and or adding hazard signs and (3) Human development by conducting Training/Refreshment Crane Operator and Signal man. (4) Strictness of the rules for using PPE for all employees related to the work as the last step in minimizing the risk of occupational hazards.
宁隆博铁路维修中心机车车体提升HIRADC分析
《条例》所称铁路养护中心的职责是实施国有铁路设施的养护。机车车辆大修中潜在危险较大的部分是液压柴油机车设备维修中使用OHTC的起重体活动。因此,有必要进行风险评估,这是一个确定控制工作事故或职业病风险水平优先次序的过程。OHSAS 18001:2007条款4.3.1的一部分。HIRADC方法可以支持一个安全系统的三阶段分析(危险识别、风险评估和控制确定)。危险识别结果获得了OHTC机车车辆车身起重作业中3个方面的危险风险,分析结果如下:起重机倾覆、设备故障、负载掉落致死;资产/财产损失影响因子。使用OHTC对机车车辆车身吊装进行风险评估分析,得出了当资源可用时采取的行动,通常是行政控制。确定相关的控制步骤,以尽量减少潜在的危险,立即(1)评估车辆车身起重SOP,并对所有与工作相关的员工进行外展,(2)制作和/或增加危险标志,(3)通过培训/小吃起重机操作员和信号员进行人员发展。(4)严格与工作相关的所有员工的个人防护装备使用规定,作为降低职业危害风险的最后一步。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信