{"title":"AN ASSESSMENT THE FINANCIAL PERFORMANCE OF MUANGKHAY WATER SUPPLY SYSTEM IN LUANG PRABANG CAPITAL, LUANG PRABANG PROVINCE","authors":"Toui Xaiveeheuang, Khampasith Thammathevo, Sisouvanh kittavong, Phoummixay Siharath, Biswadip Basu Mallik, Oupala Phanthasena, Phouthasanh Sinakhone","doi":"10.15864/jmscm.5105","DOIUrl":null,"url":null,"abstract":"Water supply is essential and an indispensable factor in the daily life of all populations. To improve the quality of life of citizens and lead to sustainable economic and social development; the party and the government has highlighted as crucial to the development of the water sector. the Some projects have been completed implement, but some of them were not matched to technical standard. Concessionaire seeks to cancel or sell the concession contract to others because they had invested, and the return is less than ought. Therefore, to guarantee the Water Supply System's implementation under the Public Private Partnership Project. This assessment aims to study and evaluate the financial performance of MuangKhay Water Supply System, Luang Prabang City, Luang Prabang Province that invest and operate by the private sector, and Build-operate-transfer for 30 years. To do this we collect data with the private operator which cost of investment, personnel, an average of chemicals, operation fees, electricity, etc., to calculate the Payback Period, Net Present Value, Internal rate of Return, and Cost Benefit Ratio. The assessment of The estimated total income for the 30-year project is 1.877.122 USD, the estimated total expenses are 667.153 USD, the investment cost is $404.425 USD, and the net cash flow is 1.209.969 USD, investors will realize a profit in 14 years, 7 months, and 18 days, therefore, the net present value is 790.488 USD, the rate of return within the project is 6,98%, the net cash flow from operations is 1.209.669 USD, and the return on capital ratio is 1,9. As a result, investment in the water supply at the MuangKhay village cluster in Luang Prabang City, Luang Prabang Province yielded a satisfactory return.","PeriodicalId":472973,"journal":{"name":"Journal of mathematical sciences & computational mathematics","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of mathematical sciences & computational mathematics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15864/jmscm.5105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Water supply is essential and an indispensable factor in the daily life of all populations. To improve the quality of life of citizens and lead to sustainable economic and social development; the party and the government has highlighted as crucial to the development of the water sector. the Some projects have been completed implement, but some of them were not matched to technical standard. Concessionaire seeks to cancel or sell the concession contract to others because they had invested, and the return is less than ought. Therefore, to guarantee the Water Supply System's implementation under the Public Private Partnership Project. This assessment aims to study and evaluate the financial performance of MuangKhay Water Supply System, Luang Prabang City, Luang Prabang Province that invest and operate by the private sector, and Build-operate-transfer for 30 years. To do this we collect data with the private operator which cost of investment, personnel, an average of chemicals, operation fees, electricity, etc., to calculate the Payback Period, Net Present Value, Internal rate of Return, and Cost Benefit Ratio. The assessment of The estimated total income for the 30-year project is 1.877.122 USD, the estimated total expenses are 667.153 USD, the investment cost is $404.425 USD, and the net cash flow is 1.209.969 USD, investors will realize a profit in 14 years, 7 months, and 18 days, therefore, the net present value is 790.488 USD, the rate of return within the project is 6,98%, the net cash flow from operations is 1.209.669 USD, and the return on capital ratio is 1,9. As a result, investment in the water supply at the MuangKhay village cluster in Luang Prabang City, Luang Prabang Province yielded a satisfactory return.
琅勃拉邦省首府muangkhay供水系统的财务绩效评估
水的供应是所有人日常生活中必不可少的因素。提高公民的生活质量,促进经济和社会的可持续发展;党和政府强调,这对水务部门的发展至关重要。部分项目已完成实施,但部分项目技术水平不达标。特许经营企业因投资不足而寻求解除或将特许经营合同出售给他人。因此,为了保证供水系统在公私合作项目下的实施。本评估旨在研究和评估琅勃拉邦省琅勃拉邦市MuangKhay供水系统由私营部门投资和运营的30年建设-运营-转让的财务绩效。为此,我们收集了私人运营商的投资成本、人员成本、平均化学品成本、运营费用、电力成本等数据,以计算投资回收期、净现值、内部收益率和成本效益比。评估预计总收入的30年期项目1.877.122美元,估计总费用是667.153美元,投资成本是404.425美元,净现金流量是1.209.969美元,投资者将在14年实现盈利,7个月,18天,因此,净现值为790.488美元,在项目的回报率是6,98%,操作的净现金流量是1.209.669美元,和资本回报率比是1,9。因此,在琅勃拉邦省琅勃拉邦市MuangKhay村的供水投资取得了令人满意的回报。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信