Project Planning Process and Performance of Government Projects in Rwanda: A Case of Bank of Kigali Arena Sports Project in Gasabo District, Rwanda

{"title":"Project Planning Process and Performance of Government Projects in Rwanda: A Case of Bank of Kigali Arena Sports Project in Gasabo District, Rwanda","authors":"","doi":"10.53819/81018102t2244","DOIUrl":null,"url":null,"abstract":"Project planning is critical in project management; this research focuses on planning process and performance of Governments projects in Rwanda. Professionals in the field have known for some time that the success of a project relies heavily on the quality of its planning. The Project Manager's primary responsibility is to ensure that the project is set up for success from the perspective of the client or stakeholder. The general objective of this research was to assess the contribution of the project planning roles on project success in Rwanda.&nbsp; Specific objectives are; to establish the effect of budget planning, communication plan and risk management plan on performance of BK Arena sports project. Through this study, the researcher’s skills and knowledge were increased in the field related to the project under study. Other researchers who would need to carry out studies related to this topic used it to get a useful literature review. The analytical-descriptive method was adopted for this investigation. The study included both quantitative and qualitative methods. There were 46 specific individuals in mind. Therefore, a census approach was necessary to ensure that all workers of the BK Arena sports project were included. Self-administered surveys were the major source of information. The data was analyzed using SPSS version 20 (Statistical Package for the Social Scientists) so that the study's connections could be established. The acquired data will be examined using an analysis of variance and descriptive statistics before being presented and summarized with frequency and distribution tables. The results show a favorable and statistically significant association between the budget plan and the BK Arena Sports project's actual outcomes (r = 0.633, p<0.05).&nbsp; The communication strategy for the BK Arena Sports project correlates positively and significantly with the project's success (r = 0.716, p<0.05). The BK Arena Sports project's success is positively and significantly correlated with the organization's risk management strategy (r = 0.735, p<0.05). With a R Squared value of 0.625, the model successfully accounts for around 62.5% of the variation in project outcomes. A good correlation between project success and the three plans used as variables in the regression model is evident. When working on the BK Arena Sports project, it's important to receive an accurate estimate of the prices of the materials and equipment that will be needed. Keywords: Project Planning Process, Performance of Government Projects, Bank of Kigali Arena Sports Project, Gasabo District, Rwanda","PeriodicalId":480774,"journal":{"name":"Journal of entrepreneurship & project management","volume":"30 10","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of entrepreneurship & project management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t2244","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Project planning is critical in project management; this research focuses on planning process and performance of Governments projects in Rwanda. Professionals in the field have known for some time that the success of a project relies heavily on the quality of its planning. The Project Manager's primary responsibility is to ensure that the project is set up for success from the perspective of the client or stakeholder. The general objective of this research was to assess the contribution of the project planning roles on project success in Rwanda.  Specific objectives are; to establish the effect of budget planning, communication plan and risk management plan on performance of BK Arena sports project. Through this study, the researcher’s skills and knowledge were increased in the field related to the project under study. Other researchers who would need to carry out studies related to this topic used it to get a useful literature review. The analytical-descriptive method was adopted for this investigation. The study included both quantitative and qualitative methods. There were 46 specific individuals in mind. Therefore, a census approach was necessary to ensure that all workers of the BK Arena sports project were included. Self-administered surveys were the major source of information. The data was analyzed using SPSS version 20 (Statistical Package for the Social Scientists) so that the study's connections could be established. The acquired data will be examined using an analysis of variance and descriptive statistics before being presented and summarized with frequency and distribution tables. The results show a favorable and statistically significant association between the budget plan and the BK Arena Sports project's actual outcomes (r = 0.633, p<0.05).  The communication strategy for the BK Arena Sports project correlates positively and significantly with the project's success (r = 0.716, p<0.05). The BK Arena Sports project's success is positively and significantly correlated with the organization's risk management strategy (r = 0.735, p<0.05). With a R Squared value of 0.625, the model successfully accounts for around 62.5% of the variation in project outcomes. A good correlation between project success and the three plans used as variables in the regression model is evident. When working on the BK Arena Sports project, it's important to receive an accurate estimate of the prices of the materials and equipment that will be needed. Keywords: Project Planning Process, Performance of Government Projects, Bank of Kigali Arena Sports Project, Gasabo District, Rwanda
卢旺达政府项目的项目规划过程与绩效——以卢旺达加萨博地区基加利银行竞技场体育项目为例
项目计划是项目管理的关键;这项研究的重点是卢旺达政府项目的规划过程和执行情况。该领域的专业人士早就知道,一个项目的成功在很大程度上依赖于其规划的质量。项目经理的主要职责是从客户或利益相关者的角度确保项目的成功。这项研究的总目标是评估项目规划作用对卢旺达项目成功的贡献。具体目标是;建立预算计划、沟通计划和风险管理计划对BK Arena体育项目绩效的影响。通过这项研究,增加了研究人员在研究项目相关领域的技能和知识。其他需要开展与此主题相关的研究的研究人员使用它来获得有用的文献综述。本研究采用分析-描述方法。本研究采用定量和定性两种方法。脑海中有46个特定的人。因此,有必要采取普查方法,以确保包括BK竞技场体育项目的所有工人。自我管理的调查是信息的主要来源。使用SPSS version 20 (Statistical Package for The Social Scientists)对数据进行分析,以便建立研究的联系。在用频率表和分布表提出和总结之前,将使用方差分析和描述性统计来检查获得的数据。结果表明,预算计划与BK竞技体育项目的实际结果存在显著的正相关关系(r = 0.633, p<0.05)。BK竞技体育项目的传播策略与项目的成功正相关且显著(r = 0.716, p<0.05)。BK竞技体育项目的成功与组织的风险管理策略正显著相关(r = 0.735, p<0.05)。该模型的R平方值为0.625,成功地解释了项目结果变化的62.5%左右。在回归模型中,项目成功与作为变量的三个计划之间的良好相关性是显而易见的。在进行BK竞技场体育项目时,获得所需材料和设备的准确价格是很重要的。关键词:项目规划流程,政府项目绩效,基加利银行竞技场体育项目,卢旺达Gasabo区
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信