Economic Feasibility Study of Rooftop Solar Power Plant 32 kWp in PT KPJB Office Building, PLTU Tanjung Jati B, Kabupaten Jepara

Oky Sensa Ritzky Cinicy, Jaka Windarta, Singgih Saptadi
{"title":"Economic Feasibility Study of Rooftop Solar Power Plant 32 kWp in PT KPJB Office Building, PLTU Tanjung Jati B, Kabupaten Jepara","authors":"Oky Sensa Ritzky Cinicy, Jaka Windarta, Singgih Saptadi","doi":"10.14710/jebt.2023.17574","DOIUrl":null,"url":null,"abstract":"Strategic initiatives in an effort to increase the role of New and Renewable Energy in the energy mix as a supply of power plants, one of which is the development of Solar Power Plants (PLTS) for own use at PLN's existing Power Plants. In 2021, the percentage of self-use power at PLTU Tanjung Jati B reaches 5.25% or the equivalent of 543 GWh, where PT. KPJB office building is one of the loads that receives self-use from the PLTU grid. Rooftop Solar Power Plant (PLTS) has been implemented on to replace the role of supplying electrical energy from the PLTU to several equipment to support the company's operations. After conducting an economic feasibility study with 3 calculation methods, namely Net Present Value (IDR. 210,436,003.12), Benefit Cost Ratio (1.17), and Payback Period (16.90), theoretically implementing a 32 kWp PLTS Rooftop can indeed said worthy. But with the three calculation results that can be considered very low with an estimated return on investment reaching almost 17 years.","PeriodicalId":483290,"journal":{"name":"Jurnal Energi Baru dan Terbarukan","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Energi Baru dan Terbarukan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/jebt.2023.17574","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Strategic initiatives in an effort to increase the role of New and Renewable Energy in the energy mix as a supply of power plants, one of which is the development of Solar Power Plants (PLTS) for own use at PLN's existing Power Plants. In 2021, the percentage of self-use power at PLTU Tanjung Jati B reaches 5.25% or the equivalent of 543 GWh, where PT. KPJB office building is one of the loads that receives self-use from the PLTU grid. Rooftop Solar Power Plant (PLTS) has been implemented on to replace the role of supplying electrical energy from the PLTU to several equipment to support the company's operations. After conducting an economic feasibility study with 3 calculation methods, namely Net Present Value (IDR. 210,436,003.12), Benefit Cost Ratio (1.17), and Payback Period (16.90), theoretically implementing a 32 kWp PLTS Rooftop can indeed said worthy. But with the three calculation results that can be considered very low with an estimated return on investment reaching almost 17 years.
贾帕拉省卡巴登市丹jung Jati B PLTU KPJB办公楼32kwp屋顶太阳能电站经济可行性研究
旨在提高新能源和可再生能源在能源结构中的作用,作为发电厂供应的战略举措,其中之一是发展太阳能发电厂(PLTS),供PLN现有发电厂自用。2021年,PLTU Tanjung Jati B的自用电力比例达到5.25%,相当于543 GWh,其中PT. KPJB办公楼是PLTU电网自用的负荷之一。屋顶太阳能发电厂(PLTS)已经实施,以取代从PLTU向几个设备供应电能的角色,以支持公司的运营。通过三种计算方法进行经济可行性研究,即净现值(IDR)。210,436,003.12),效益成本比(1.17)和投资回收期(16.90),理论上实施32kwp PLTS屋顶确实是值得的。但根据这三个计算结果,可以认为这是非常低的,估计投资回报率接近17年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信