{"title":"The Extreme Flood Capacity of Al-Majjarah Canal and Regulator Within Al-Ramadi Project System","authors":"Amro Al-Tameemi, Hayder Al-Thamiry","doi":"10.29194/njes.26030235","DOIUrl":null,"url":null,"abstract":"It is essential to review and develop a system of water control structures and canals that can be used to manage high-flow discharges and the flood control plan requirement to modify the system's capacity. Al-Ramadi Project System is considered one of the main flood control projects on the Euphrates River within Anbar Governorate, Western Iraq. This study will focus on Al-Majjarah Canal and Regulator, which is part of Al-Ramadi Project and has the function of a link canal between Al-Habbaniyah and Al-Razazza lakes, and describe the capacity of the canal under typical operating conditions and during floods. The study used HEC-RAS 6.1 software to run a numerical model to simulate this canal. According to previous research studies near the research region on the Euphrates River, for the main canal, the roughness coefficient was taken at 0.026, and for the flood plain, it was taken at 0.03. The same parameter value was applied to Al-Majjarah Canal. Due to the study region's similar geology and nature. Moreover, a sensitivity analysis was made of the roughness coefficient and its influence on the water surface elevation for the canal. The model result indicated in the current situation of Al-Majjarah Canal can pass a flow rate of 1300 m3/s when Al-Razazza Lake is at an average water level that has been approved by the Ministry of Water Resources at 32.02 m.a.m.s.l.. If the water level in Al-Razazza Lake is in the semi-filled position of 40 m.a.m.s.l., it causes floods for the canal because the water level rises above the banks of the canal at the last kilometer from the canal, even when passing a few discharges through the canal. Accordingly, it is not possible to safely pass the flow rate for a flood wave with a 500-year return period predicted by the \"Study of Strategy for Water and Land Resources in Iraq (2014)\", which is 2000 m3/s for this canal, without making modifications to the expansion of Al-Majjarah Regulator by adding additional gates, expanding the entrance and exit of the Regulator, reshaping and expanding some cross-sections, and raising some of the banks for the canal. The above-mentioned modification were applied for the purpose of passing the expected discharge from the canal, while maintaining a freeboard of 1 m between the water surface and the canal banks.","PeriodicalId":7470,"journal":{"name":"Al-Nahrain Journal for Engineering Sciences","volume":"112 12","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Al-Nahrain Journal for Engineering Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29194/njes.26030235","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It is essential to review and develop a system of water control structures and canals that can be used to manage high-flow discharges and the flood control plan requirement to modify the system's capacity. Al-Ramadi Project System is considered one of the main flood control projects on the Euphrates River within Anbar Governorate, Western Iraq. This study will focus on Al-Majjarah Canal and Regulator, which is part of Al-Ramadi Project and has the function of a link canal between Al-Habbaniyah and Al-Razazza lakes, and describe the capacity of the canal under typical operating conditions and during floods. The study used HEC-RAS 6.1 software to run a numerical model to simulate this canal. According to previous research studies near the research region on the Euphrates River, for the main canal, the roughness coefficient was taken at 0.026, and for the flood plain, it was taken at 0.03. The same parameter value was applied to Al-Majjarah Canal. Due to the study region's similar geology and nature. Moreover, a sensitivity analysis was made of the roughness coefficient and its influence on the water surface elevation for the canal. The model result indicated in the current situation of Al-Majjarah Canal can pass a flow rate of 1300 m3/s when Al-Razazza Lake is at an average water level that has been approved by the Ministry of Water Resources at 32.02 m.a.m.s.l.. If the water level in Al-Razazza Lake is in the semi-filled position of 40 m.a.m.s.l., it causes floods for the canal because the water level rises above the banks of the canal at the last kilometer from the canal, even when passing a few discharges through the canal. Accordingly, it is not possible to safely pass the flow rate for a flood wave with a 500-year return period predicted by the "Study of Strategy for Water and Land Resources in Iraq (2014)", which is 2000 m3/s for this canal, without making modifications to the expansion of Al-Majjarah Regulator by adding additional gates, expanding the entrance and exit of the Regulator, reshaping and expanding some cross-sections, and raising some of the banks for the canal. The above-mentioned modification were applied for the purpose of passing the expected discharge from the canal, while maintaining a freeboard of 1 m between the water surface and the canal banks.
Al-Majjarah运河的极端泄洪能力及其在Al-Ramadi工程系统中的调节
必须审查和发展一个可用于管理大流量排放的水控制结构和运河系统,并根据防洪计划的要求修改系统的能力。拉马迪工程系统被认为是伊拉克西部安巴尔省幼发拉底河上的主要防洪工程之一。本研究将集中于Al-Majjarah运河和Regulator,这是Al-Ramadi项目的一部分,具有连接Al-Habbaniyah和Al-Razazza湖泊的功能,并描述运河在典型作业条件下和洪水期间的容量。本研究使用HEC-RAS 6.1软件运行数值模型来模拟该管道。根据前人在幼发拉底河研究区附近的研究,主渠道的粗糙度系数取0.026,冲积平原的粗糙度系数取0.03。同样的参数值也适用于Al-Majjarah运河。由于研究区地质性质相似。此外,还对运河的粗糙度系数及其对水面高程的影响进行了敏感性分析。模型结果表明,当Al-Razazza湖处于水利部批准的平均水位32.02 m.a.s.l时,Al-Majjarah运河在目前情况下可以通过1300 m3/s的流量。如果Al-Razazza湖的水位处于40m.m.s.l的半满水位,就会引起运河的洪水,因为在离运河最后一公里的地方,水位会超过运河的河岸,即使有一些排放物通过运河。因此,如果不对扩建的Al-Majjarah调节阀进行修改,增加额外的闸门,扩大调节阀的入口和出口,重塑和扩大一些断面,并提高运河的一些堤岸,就不可能安全通过“伊拉克水资源和土地资源战略研究(2014)”预测的500年回潮期的洪水流量,即2000立方米/s。上述修改的目的是为了通过运河的预期排放量,同时保持水面和运河两岸之间的干舷1米。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信