{"title":"Ore blending planning and green shovel allocation in open-pit mines: a case study in a copper mine","authors":"Natanael Salgado Coutinho, Tatianna Aparecida Pereira Beneteli, Gustavo Pessin, Luciano Perdig�ã, o Cota","doi":"10.1504/ijmme.2023.133648","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":38622,"journal":{"name":"International Journal of Mining and Mineral Engineering","volume":"152 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Mineral Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijmme.2023.133648","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}