Helda Shantyabudi, Busyra Azheri, Nani Mulyati
{"title":"","authors":"Helda Shantyabudi, Busyra Azheri, Nani Mulyati","doi":"10.25077/nalrev.v.7.i.1.p.79-92.2023","DOIUrl":null,"url":null,"abstract":"Construction projects are considered a sector loaded with risks. Almost every construction service industry activity always appears as a claim, often becoming a dispute. The legal basis for the settlement of construction contract disputes is regulated in Article 88 of Law Number 2 of 2017 by directing dispute settlement through an out-of-court mechanism and providing support for the existence of a dispute board to avoid claims before they arise into disputes. However, Law Number 2 of 2017 does not provide detailed regulations regarding dispute boards, so parties in Indonesia's construction service industry doubt its effectiveness. The research aim is to analyze the implementation of legal risk mitigation to avoid construction contract disputes. The research methodology is done in normative legal research by combining historical, statute, comparative, and conceptual approaches. Research data sources are secondary legal materials and research data collection methods conducted by library research. The results of the study show that there are fundamental differences between construction claims and lawsuits. The concept of dispute avoidance is designed to change the culture to enable proactive dispute prevention and real-time dispute resolution. The dispute board rules in Indonesia are regulated in the Regulation of Minister of Public Works and Public Housing Number 11 of 2021. The output of the dispute boards is a formal decision that is final and binding. In this case, it is not equivalent to an enforceable decision but is contractually binding.","PeriodicalId":33148,"journal":{"name":"Nagari Law Review","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nagari Law Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/nalrev.v.7.i.1.p.79-92.2023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction projects are considered a sector loaded with risks. Almost every construction service industry activity always appears as a claim, often becoming a dispute. The legal basis for the settlement of construction contract disputes is regulated in Article 88 of Law Number 2 of 2017 by directing dispute settlement through an out-of-court mechanism and providing support for the existence of a dispute board to avoid claims before they arise into disputes. However, Law Number 2 of 2017 does not provide detailed regulations regarding dispute boards, so parties in Indonesia's construction service industry doubt its effectiveness. The research aim is to analyze the implementation of legal risk mitigation to avoid construction contract disputes. The research methodology is done in normative legal research by combining historical, statute, comparative, and conceptual approaches. Research data sources are secondary legal materials and research data collection methods conducted by library research. The results of the study show that there are fundamental differences between construction claims and lawsuits. The concept of dispute avoidance is designed to change the culture to enable proactive dispute prevention and real-time dispute resolution. The dispute board rules in Indonesia are regulated in the Regulation of Minister of Public Works and Public Housing Number 11 of 2021. The output of the dispute boards is a formal decision that is final and binding. In this case, it is not equivalent to an enforceable decision but is contractually binding.
建设项目被认为是一个充满风险的行业。几乎每一个建筑服务行业的活动总是以索赔的形式出现,往往成为纠纷。2017年第2号法律第88条规定了解决建筑合同纠纷的法律依据,指导通过庭外机制解决纠纷,并为设立争议委员会提供支持,以避免纠纷发生前的索赔。然而,2017年第2号法律并没有提供关于争议委员会的详细规定,因此印度尼西亚建筑服务行业的各方怀疑其有效性。研究的目的是分析法律风险规避的实施,以避免施工合同纠纷。研究方法是通过结合历史、法规、比较和概念方法在规范法律研究中完成的。研究数据来源是通过图书馆研究进行的二手法律资料和研究数据收集方法。研究结果表明,施工索赔与诉讼之间存在着根本的区别。避免争议的概念旨在改变文化,使主动预防争议和实时解决争议成为可能。印度尼西亚的争议委员会规则由2021年第11号公共工程和公共住房部长条例规定。争议委员会的结果是一个正式的决定,是最终的和有约束力的。在这种情况下,它不等同于可强制执行的决定,但具有合同约束力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
20 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信