Peramalan Beban Listrik Kabupaten Pesisir Selatan Dengan Analisis Regresi

Elektron Pub Date : 2023-06-27 DOI:10.30630/eji.15.1.340
Zulka Hendri, Efendi Efendi, Junaidi Asrul, Fitriadi Fitriadi
{"title":"Peramalan Beban Listrik Kabupaten Pesisir Selatan Dengan Analisis Regresi","authors":"Zulka Hendri, Efendi Efendi, Junaidi Asrul, Fitriadi Fitriadi","doi":"10.30630/eji.15.1.340","DOIUrl":null,"url":null,"abstract":"The more electric vehicles emerge, the more electricity demand will increase in each region. This will encourage electricity providers to increase the number or capacity of generators. The construction of a new power plant requires load forecasting to determine how much capacity the plant will build. This study aims to predict the electrical load in Pesisir Selatan, West Sumatra until 2031 using linear regression analysis and time series. Forecasting is done on each sector of PLN customers. Forecasting is done based on the PLN customer sector. The forecasting sectors are the household, business, social and government sectors. The four test criteria were carried out are namely the coefficient of determination test (R2), the F test, the T test and the mean absolute percentage error (MAPE). The forecasting results show that in 2031 the electricity load for the household sector is 120.1 MW, the business sector is 5.7 MW, the social sector is 56.9 MW and the government is 9.5 MW.","PeriodicalId":34872,"journal":{"name":"Elektron","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elektron","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30630/eji.15.1.340","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The more electric vehicles emerge, the more electricity demand will increase in each region. This will encourage electricity providers to increase the number or capacity of generators. The construction of a new power plant requires load forecasting to determine how much capacity the plant will build. This study aims to predict the electrical load in Pesisir Selatan, West Sumatra until 2031 using linear regression analysis and time series. Forecasting is done on each sector of PLN customers. Forecasting is done based on the PLN customer sector. The forecasting sectors are the household, business, social and government sectors. The four test criteria were carried out are namely the coefficient of determination test (R2), the F test, the T test and the mean absolute percentage error (MAPE). The forecasting results show that in 2031 the electricity load for the household sector is 120.1 MW, the business sector is 5.7 MW, the social sector is 56.9 MW and the government is 9.5 MW.
利用回归分析预测南佩西锡尔地区的电力负荷
电动汽车越多,每个地区的电力需求就会增加。这将鼓励电力供应商增加发电机的数量或容量。新电厂的建设需要负荷预测,以确定电厂将建设多少容量。本研究旨在利用线性回归分析和时间序列分析,预测西苏门答腊岛Pesisir Selatan到2031年的电力负荷。对PLN客户的各个部门进行预测。预测是根据PLN客户部门进行的。预测部门是家庭、企业、社会和政府部门。采用四项检验标准,即决定系数检验(R2)、F检验、T检验和平均绝对百分比误差(MAPE)。预测结果显示,到2031年,家庭用电负荷为120.1 MW,商业用电负荷为5.7 MW,社会用电负荷为56.9 MW,政府用电负荷为9.5 MW。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
2
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信