Analysis of Uneven Settlement and Deformation of the Existing Railway under the Condition of Mined-out Area after Mining

{"title":"Analysis of Uneven Settlement and Deformation of the Existing Railway under the Condition of Mined-out Area after Mining","authors":"","doi":"10.23977/jceup.2023.050809","DOIUrl":null,"url":null,"abstract":"Due to the railway construction being ahead and the mining work being behind, it is inevitable for some mining areas to pass under the railway. However, at present, for the mining work face passes across under the railway there is a lack of research and evaluation on the deformation of the existing railway roadbed after the upper strata of the goaf were reinforced and repaired. Based on the deformation monitoring of roadbed after the 5301 mining face passed under the section form milepost DK1 290 to milepost DK2 755 of Gucheng Special Railway, the variation law of the uneven deformation of the existing railway roadbed on the goaf was studied. The research results indicated that the deformation in the transition area and the stable area of the existing railway roadbed was very small, while the subgrade deformation of the existing railway above the goaf was relatively large, and the maximum vertical displacement of railway subgrade was 7.8 cm within 3 months. According to the analysis of monitoring data, the deformation distribution law of existing railway subgrade above goaf was in shape of \"V\".","PeriodicalId":144072,"journal":{"name":"Journal of Civil Engineering and Urban Planning","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Urban Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23977/jceup.2023.050809","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Due to the railway construction being ahead and the mining work being behind, it is inevitable for some mining areas to pass under the railway. However, at present, for the mining work face passes across under the railway there is a lack of research and evaluation on the deformation of the existing railway roadbed after the upper strata of the goaf were reinforced and repaired. Based on the deformation monitoring of roadbed after the 5301 mining face passed under the section form milepost DK1 290 to milepost DK2 755 of Gucheng Special Railway, the variation law of the uneven deformation of the existing railway roadbed on the goaf was studied. The research results indicated that the deformation in the transition area and the stable area of the existing railway roadbed was very small, while the subgrade deformation of the existing railway above the goaf was relatively large, and the maximum vertical displacement of railway subgrade was 7.8 cm within 3 months. According to the analysis of monitoring data, the deformation distribution law of existing railway subgrade above goaf was in shape of "V".
采空区条件下既有铁路开采后不均匀沉降变形分析
由于铁路建设超前,采矿工作滞后,一些矿区从铁路下穿是不可避免的。然而,目前对于铁路下穿采煤工作面,缺乏对采空区上部加固修复后既有铁路路基变形的研究和评价。通过5301采煤工作面在固城铁路专用线DK1 290至DK2 755界标断面下通过后的路基变形监测,研究了既有铁路路基在采空区上不均匀变形的变化规律。研究结果表明:既有铁路路基过渡区和稳定区变形很小,而采空区上方既有铁路路基变形较大,3个月内铁路路基垂直位移最大为7.8 cm。根据监测资料分析,采空区以上既有铁路路基变形分布规律呈“V”形。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信