Financing Managed Aquifer Recharge Projects

IF 1.8 4区 环境科学与生态学 Q3 WATER RESOURCES
Charles Job
{"title":"Financing Managed Aquifer Recharge Projects","authors":"Charles Job","doi":"10.1111/gwmr.12620","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":55081,"journal":{"name":"Ground Water Monitoring and Remediation","volume":"43 4","pages":"11-17"},"PeriodicalIF":1.8000,"publicationDate":"2023-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ground Water Monitoring and Remediation","FirstCategoryId":"93","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1111/gwmr.12620","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"WATER RESOURCES","Score":null,"Total":0}
引用次数: 0

Abstract Image

资助管理含水层补给项目
地下水监测与修复早期视图客座编辑融资管理含水层补给项目Charles Job, Charles Job [email protected]搜索本文作者的更多论文Charles Job, Charles Job [email protected]搜索本文作者的更多论文首次发表:2023年11月07日https://doi.org/10.1111/gwmr.12620Read全文taboutpdf ToolsRequest permissionExport citationAdd to favoritesTrack citation ShareShare给予accessShare全文accessShare全文accessShare请查看我们的使用条款和条件,并勾选下面的复选框共享文章的全文版本。我已经阅读并接受了Wiley在线图书馆使用共享链接的条款和条件,请使用下面的链接与您的朋友和同事分享本文的全文版本。学习更多的知识。链接共享emailfacebook twitter linkedinreddit微信参考亚利桑那州水资源部(ADWR)2023. 农村项目;资金来源。https://new.azwater.gov/rural-programs/grants(2023年7月25日访问)。加州水资源管理委员会(CWRCB)。2023. 财政援助资金-补助金和贷款。https://www.waterboards.ca.gov/water_issues/programs/grants_loans/(2023年7月25日访问)。联邦科学与工业研究组织(CSIRO)。2019. 管理含水层补给。https://research.csiro.au/mar/(2023年7月24日访问)。Doremus, L.和C. Job. 2022。管理含水层补给的国家监管框架的关键要素。地下水60号,没有。5: 591 - 601。McCurry, G.和D. Pyne. 2022。规划管理含水层补给项目。地下水60号,没有。5: 583 - 590。Perrone, D.和M. Rohde. 2016。加州管理含水层补给的效益和经济成本。《旧金山河口与流域科学》第14卷。2: 4。https://doi.org/10.15447/sfews.2016v14iss2art4 Pyne, D. 2005。含水层储量恢复;地下水通过井补给指南,608。Gainesville, FL: ASR Systems LLC. Texas Water Development Board (TWDB)。2023 a。SFY 2023预期使用计划;清洁水国家循环基金。https://www.twdb.texas.gov/financial/programs/CWSRF/doc/SFY2023/SFY2023-CWSRF-IUP.pdf(2023年8月8日访问)。德克萨斯州水资源开发委员会(TWDB)。2023 b。《通信》,A. Croskrey和S. Galaway著。德克萨斯州水资源开发委员会(TWDB)。2022. 通讯部,安德里亚·克罗斯克雷。美国环境保护署。2023a。谅解备忘录;两党基础设施法中清洁水州循环基金条款的2023财年程序和分配。https://www.epa.gov/cwsrf/clean-water-state-revolving-fund-cwsrf-implementation#annual(访问于2023年7月25日)美国环境保护署。谅解备忘录;基于第七次饮用水基础设施需求调查评估的2023财年饮用水国家循环基金分配。https://www.epa.gov/dwsrf(2023年7月25日访问)。郑勇,陈志强,陈志强,陈志强。21世纪含水层补给管理的水质挑战:走向基于风险的监管方法。水文地质学报31(1):31 - 34。https://doi.org/10.1007/s10040-022-02543-z郑y, A. Ross, K.G. Villholth, P. Dillon(编)。2021. 管理含水层补给:韧性和可持续性的展示,379。巴黎,法国:联合国教育、科学及文化组织。https://unesdoc.unesco.org/ark:/48223/pf0000379962(访问日期为2022年12月22日)早期视图,记录的在线版本在被纳入问题之前
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.30
自引率
10.50%
发文量
60
审稿时长
>36 weeks
期刊介绍: Since its inception in 1981, Groundwater Monitoring & Remediation® has been a resource for researchers and practitioners in the field. It is a quarterly journal that offers the best in application oriented, peer-reviewed papers together with insightful articles from the practitioner''s perspective. Each issue features papers containing cutting-edge information on treatment technology, columns by industry experts, news briefs, and equipment news. GWMR plays a unique role in advancing the practice of the groundwater monitoring and remediation field by providing forward-thinking research with practical solutions.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信