A critical review of planning and scheduling in steel-making and continuous casting in the steel industry

IF 2.7 4区 管理学 Q2 MANAGEMENT
Myungho Lee, Kyungduk Moon, Kangbok Lee, Juntaek Hong, Michael Pinedo
{"title":"A critical review of planning and scheduling in steel-making and continuous casting in the steel industry","authors":"Myungho Lee, Kyungduk Moon, Kangbok Lee, Juntaek Hong, Michael Pinedo","doi":"10.1080/01605682.2023.2265416","DOIUrl":null,"url":null,"abstract":"AbstractSteel-making and continuous casting (SCC) processes are considered the main bottlenecks in the steel industry. We consider planning and scheduling problems in SCC processes and provide an overview of the literature with our commentary. The planning problem has as goal to create out of customer orders production units for the various production processes. The scheduling problem assigns these production units to the production facilities over different time intervals. We review a large number of planning and scheduling papers and propose two basic models for the planning and the scheduling problems that incorporate the most common and essential features. We describe for each problem the respective constraints and objectives as well as the practical implications in an actual production environment. We also analyse the methodologies used in their solutions, including decomposition strategies. In the last section, we present the conclusions of our survey and propose new research directions.Keywords: Steel-makingcontinuous castingproduction planningschedulingsurvey Disclosure statementNo potential conflict of interest was reported by the author(s).Additional informationFundingThis work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government(MSIT) (Grant Number: NRF-2023R1A2C200694911).","PeriodicalId":17308,"journal":{"name":"Journal of the Operational Research Society","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2023-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Operational Research Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/01605682.2023.2265416","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

AbstractSteel-making and continuous casting (SCC) processes are considered the main bottlenecks in the steel industry. We consider planning and scheduling problems in SCC processes and provide an overview of the literature with our commentary. The planning problem has as goal to create out of customer orders production units for the various production processes. The scheduling problem assigns these production units to the production facilities over different time intervals. We review a large number of planning and scheduling papers and propose two basic models for the planning and the scheduling problems that incorporate the most common and essential features. We describe for each problem the respective constraints and objectives as well as the practical implications in an actual production environment. We also analyse the methodologies used in their solutions, including decomposition strategies. In the last section, we present the conclusions of our survey and propose new research directions.Keywords: Steel-makingcontinuous castingproduction planningschedulingsurvey Disclosure statementNo potential conflict of interest was reported by the author(s).Additional informationFundingThis work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government(MSIT) (Grant Number: NRF-2023R1A2C200694911).
钢铁工业炼钢和连铸的计划和调度评述
摘要炼钢和连铸工艺被认为是钢铁工业的主要瓶颈。我们考虑SCC过程中的计划和调度问题,并提供文献综述和我们的评论。计划问题的目标是为各种生产过程创建客户订单之外的生产单元。调度问题将这些生产单元在不同的时间间隔内分配给生产设施。我们回顾了大量的规划和调度论文,并提出了两个基本模型的规划和调度问题,其中包含了最常见和最基本的特征。我们描述了每个问题各自的约束条件和目标,以及在实际生产环境中的实际含义。我们还分析了他们的解决方案中使用的方法,包括分解策略。最后,我们给出了调查的结论,并提出了新的研究方向。关键词:炼钢连铸生产计划调度调查披露声明作者未报告潜在利益冲突。本研究由韩国政府(MSIT)资助的韩国国家研究基金会(NRF)资助(资助号:NRF- 2023r1a2c200694911)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of the Operational Research Society
Journal of the Operational Research Society 管理科学-运筹学与管理科学
CiteScore
6.80
自引率
13.90%
发文量
144
审稿时长
7.3 months
期刊介绍: JORS is an official journal of the Operational Research Society and publishes original research papers which cover the theory, practice, history or methodology of OR.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信