Myungho Lee, Kyungduk Moon, Kangbok Lee, Juntaek Hong, Michael Pinedo
{"title":"A critical review of planning and scheduling in steel-making and continuous casting in the steel industry","authors":"Myungho Lee, Kyungduk Moon, Kangbok Lee, Juntaek Hong, Michael Pinedo","doi":"10.1080/01605682.2023.2265416","DOIUrl":null,"url":null,"abstract":"AbstractSteel-making and continuous casting (SCC) processes are considered the main bottlenecks in the steel industry. We consider planning and scheduling problems in SCC processes and provide an overview of the literature with our commentary. The planning problem has as goal to create out of customer orders production units for the various production processes. The scheduling problem assigns these production units to the production facilities over different time intervals. We review a large number of planning and scheduling papers and propose two basic models for the planning and the scheduling problems that incorporate the most common and essential features. We describe for each problem the respective constraints and objectives as well as the practical implications in an actual production environment. We also analyse the methodologies used in their solutions, including decomposition strategies. In the last section, we present the conclusions of our survey and propose new research directions.Keywords: Steel-makingcontinuous castingproduction planningschedulingsurvey Disclosure statementNo potential conflict of interest was reported by the author(s).Additional informationFundingThis work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government(MSIT) (Grant Number: NRF-2023R1A2C200694911).","PeriodicalId":17308,"journal":{"name":"Journal of the Operational Research Society","volume":"214 5","pages":"0"},"PeriodicalIF":2.7000,"publicationDate":"2023-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Operational Research Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/01605682.2023.2265416","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0
Abstract
AbstractSteel-making and continuous casting (SCC) processes are considered the main bottlenecks in the steel industry. We consider planning and scheduling problems in SCC processes and provide an overview of the literature with our commentary. The planning problem has as goal to create out of customer orders production units for the various production processes. The scheduling problem assigns these production units to the production facilities over different time intervals. We review a large number of planning and scheduling papers and propose two basic models for the planning and the scheduling problems that incorporate the most common and essential features. We describe for each problem the respective constraints and objectives as well as the practical implications in an actual production environment. We also analyse the methodologies used in their solutions, including decomposition strategies. In the last section, we present the conclusions of our survey and propose new research directions.Keywords: Steel-makingcontinuous castingproduction planningschedulingsurvey Disclosure statementNo potential conflict of interest was reported by the author(s).Additional informationFundingThis work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government(MSIT) (Grant Number: NRF-2023R1A2C200694911).
期刊介绍:
JORS is an official journal of the Operational Research Society and publishes original research papers which cover the theory, practice, history or methodology of OR.