METHODOLOGY FOR DETERMINING THE ECONOMIC INDICATORS OF A PROJECT WITH AGILE TEAM STRUCTURE

V.A. Drabenko, D.V. Drabenko, S.N. Zakharov, V.K. Klyuev, D.O. Klyueva
{"title":"METHODOLOGY FOR DETERMINING THE ECONOMIC INDICATORS OF A PROJECT WITH AGILE TEAM STRUCTURE","authors":"V.A. Drabenko, D.V. Drabenko, S.N. Zakharov, V.K. Klyuev, D.O. Klyueva","doi":"10.36807/2411-7269-2023-3-34-14-19","DOIUrl":null,"url":null,"abstract":"The article considers a combination of Time Driven Activity Based Costing techniques, coupled with a Commitment point strategy in conditions of a high degree of uncertainty, to objectify the assessment of aspects of project activity. The description and formalized structuring of the hybrid strategy in the context of small and medium-sized organizations is formulated. The article analyzes modern practices in determining the methodological models of project evaluation, related strategies and the possibility of practical application for the effective economic activity of organizations.","PeriodicalId":498457,"journal":{"name":"Экономический вектор","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Экономический вектор","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36807/2411-7269-2023-3-34-14-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The article considers a combination of Time Driven Activity Based Costing techniques, coupled with a Commitment point strategy in conditions of a high degree of uncertainty, to objectify the assessment of aspects of project activity. The description and formalized structuring of the hybrid strategy in the context of small and medium-sized organizations is formulated. The article analyzes modern practices in determining the methodological models of project evaluation, related strategies and the possibility of practical application for the effective economic activity of organizations.
确定具有敏捷团队结构的项目经济指标的方法
本文考虑了时间驱动的基于活动的成本计算技术的组合,以及在高度不确定性条件下的承诺点策略,以客观化项目活动方面的评估。提出了中小企业背景下混合战略的描述和形式化结构。本文分析了确定项目评估方法模型、相关策略和组织有效经济活动实际应用可能性的现代实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书